1 Hazard and Risk Identification and Control
CHST · 110 questions
- A masonry crew is dry-cutting concrete pavers inside an enclosed parking structure, generating thick clouds of respirable crystalline silica dust. Applying the hierarchy of controls, which measure provides the highest level of worker protection among the choices?
- An electrical crew is running portable corded drills from temporary 120-volt, 15-ampere receptacle outlets on a damp commercial jobsite that does not use an assured equipment grounding conductor program. What electrical protection is required for those outlets?
- Heavy overnight rain leaves standing water at the bottom of a 7-foot utility trench protected by a trench box, and the crew arrives ready to resume laying pipe. What must happen before any worker enters the excavation?
- A utility crew prepares to enter a deep concrete manhole to inspect a sewer tie-in, and the safety technician sets up a calibrated multi-gas meter to test the atmosphere from outside the space. In what order must the atmospheric hazards be evaluated?
- A mobile crane crew is preparing to set rooftop HVAC units near an energized 13.8-kilovolt overhead distribution line. Under OSHA 29 CFR 1926 Subpart CC, what is the minimum clearance distance the crane and load must maintain from the line?
- Carpenters on a multi-story commercial building are framing interior floor openings and perimeter edges above a lower concrete slab. At what vertical height above a lower level does OSHA 29 CFR 1926 Subpart M require fall protection for general construction work?
- During a pre-lift inspection, a rigger finds a synthetic web sling with a one-inch cut along its edge and exposed red core warning yarns. What action must the safety technician require before the crane lift proceeds?
- A framing crew sets up a portable extension ladder to access a flat commercial roof 14 feet above the ground, and the foreman asks how to position the top of the ladder. What must the crew do to comply with OSHA ladder standards?
- A utility crew is excavating an 8-foot-deep trench for a storm drain using an excavator, and the operator asks where to place the excavated soil near the trench. What must the crew do to protect workers inside the trench?
- A painting crew transfers an industrial solvent from a labeled 55-gallon drum into portable spray bottles that will be shared across two shifts by multiple workers. What labeling must be applied to the spray bottles under OSHA Hazard Communication standards?
- During a night shift, a pipefitter splashes a solvent primer onto their forearm and asks the foreman for chemical first-aid and hazard information. How must Safety Data Sheets be maintained on the construction site to meet OSHA Hazard Communication requirements?
- A concrete restoration crew is assigned to grind mortar joints where engineering controls cannot keep silica below the permissible exposure limit, requiring tight-fitting N95 respirators. What must each worker complete before using a respirator on the job?
- An electrician locks and tags out the main disconnect for a commercial HVAC air handler before replacing a fan belt, and confirms the disconnect handle is in the off position. What critical step must the electrician complete before reaching into the belt housing?
- Ironworkers are tying vertical #5 rebar dowels protruding two feet above a concrete footing while carpenters work directly above on formwork. What must be installed on the exposed rebar ends under 29 CFR 1926.701(b)?
- Before using a portable four-gas monitor to check a utility vault, a technician sees the display shows normal ambient oxygen and zero toxic gas, and the annual factory calibration sticker is current. What instrument check is still required before daily use?
- Masons are laying block from a supported welded-frame scaffold platform that lacks guardrails and personal fall arrest systems. Under OSHA 29 CFR 1926.451(g)(1), at what height above a lower level does fall protection become mandatory on a scaffold?
- During pre-construction design review for a warehouse, the safety technician notices roofers will need to install edge flashing near an unprotected 30-foot drop. Which recommendation best applies Safety through Design principles?
- A rigging crew prepares to lift a 4,000-pound steel beam using a two-leg bridle sling, and the rigger suggests shortening the sling legs so the angle from the horizontal drops from 60 degrees to 30 degrees for extra headroom. How does reducing that sling angle affect the load on each leg?
- Ironworkers are torch-cutting and scraping lead-based paint on an older highway bridge where airborne lead exceeds the permissible exposure limit (50 µg/m³ as an 8-hour TWA). Under 29 CFR 1926.62(i), what hygiene control must the employer enforce for breaks and meals?
- A site crew is preparing to dig a 6-foot-deep trench for a new water line in an area where public utility locators marked painted gas and fiber lines on the asphalt. What must happen as the excavator approaches the marked utility zone?
- A highway paving contractor hires six new laborers in mid-July when afternoon heat index values exceed 95 degrees Fahrenheit. To prevent heat-related illnesses during their first one to two weeks, how should the safety technician advise scheduling their work?
- An electrician operating an articulating boom lift near steel roof trusses wants to clip a personal fall arrest lanyard to an adjacent structural beam instead of the basket because the beam looks sturdier. What must the safety technician require?
- A demolition crew renovating a 1974 municipal building encounters chalky pipe insulation in a mechanical chase and wants to strip it out dry to finish before lunch. What must the safety technician require before the material is disturbed?
- While inspecting a mechanical contractor's outdoor laydown yard, a safety technician finds full oxygen and acetylene cylinders chained upright together against the same wooden shed wall. What must the technician require for proper storage?
- A concrete crew wants to use a compressed air wand connected to a 100-psi compressor to blow dust out of anchor bolt holes before epoxy grouting. Under 29 CFR 1926.302(b)(4), what condition must be met to use compressed air for cleaning?
- A project superintendent wants to strip shoring and formwork beneath an elevated concrete slab 72 hours after the pour to keep the schedule moving, even though cold weather slowed curing. What must happen before formwork is removed under 29 CFR 1926.703(e)(1)?
- An electrician positions a non-self-supporting extension ladder against a concrete masonry wall at a working length of 20 feet to reach a conduit junction box. Under OSHA 29 CFR 1926.1053, how far from the wall must the base of the ladder be placed?
- During a pre-task check, a safety technician notices a pipefitter mounting a 4,500-RPM abrasive grinding wheel onto a pneumatic angle grinder rated at 6,000 RPM. What must the technician require before the grinder is used?
- A masonry subcontractor is preparing to build a 12-foot-high concrete block wall on a commercial retail project. Before wall construction begins, what limited access zone must be established under 29 CFR 1926.706(a)?
- A general contractor is mobilizing a crew to demolish an aging two-story brick warehouse before new site utilities are installed. Before any worker is permitted to start demolition operations, what must the employer ensure is completed?
- Personal dosimetry on a bridge deck demolition crew shows an 8-hour time-weighted average noise exposure of 98 dBA from pneumatic jackhammers, exceeding the 90 dBA permissible exposure limit under 29 CFR 1926.52. What control strategy must the employer pursue first?
- A painting crew needs to transfer a Category 1, 2, or 3 flammable liquid from a 55-gallon metal drum into a smaller 5-gallon metal safety can inside a well-ventilated equipment shed. What electrical precaution must the crew take before opening the drum valve?
- Carpenters are building a wooden perimeter guardrail system around an open second-floor concrete slab edge 16 feet above the ground. Under OSHA 29 CFR 1926.502, what vertical height above the walking/working level must the top edge of the top rail meet?
- During a morning inspection of a 6-foot-deep, 60-foot-long utility trench, a safety technician sees two pipelayers working at the far end while the only access ladder sits at the opposite end 55 feet away. What must the technician require to comply with 29 CFR 1926.651(c)(2)?
- During a framing walk on a commercial apartment project, a safety technician sees a carpenter using a portable circular saw whose lower telescoping blade guard is wedged open with a wooden shim. What must the technician require immediately?
- During a midday walk on a commercial framing site, a safety technician sees piles of stripped formwork lumber with exposed nails scattered across a main stairwell landing and corridor. What must the technician require under OSHA housekeeping rules?
- A mechanical contractor unloads twenty-foot lengths of 12-inch ductile iron pipe onto timber dunnage in an active laydown yard. Under 29 CFR 1926.250(b)(9), what must the crew do to store the pipe safely?
- A tandem-axle haul truck with an obstructed rear view arrives on a busy highway bridge site to deliver aggregate, and its backup alarm is inoperable. Under 29 CFR 1926.601(b)(4), how may the truck back up safely?
- A utility crew is excavating a 5-foot-deep trench adjacent to a former gasoline service station where fuel odors are noticeable in the soil. Under 29 CFR 1926.651(g), what must happen before any worker enters the trench?
- A bridge deck crew is tying rebar in freezing rain and 25-mile-per-hour winds during a January cold snap. Which combination of controls best protects workers from hypothermia and cold injury?
- A mobile crane is setting steel roof trusses in a tight commercial courtyard where laborers frequently walk past the rear of the carrier to reach a material laydown area. What control must be established under OSHA 29 CFR 1926.1424 to protect workers from being struck or crushed by the counterweight?
- A masonry crew is erecting a three-tier welded-frame scaffold on compacted dirt outside a new retail building. What must be placed beneath every scaffold leg to prevent settling or displacement?
- Bridge rehabilitation workers operating pneumatic concrete breakers for full shifts report tingling, numbness, and white fingertips in cool morning air. Which control strategy best addresses the primary occupational health hazard?
- A utility crew is excavating a 9-foot-deep trench in wet, granular Type C soil where groundwater seepage is visible along the lower walls. Under OSHA 29 CFR 1926 Subpart P, why must the safety technician reject the foreman's plan to bench the trench walls?
- A mobile crane subcontractor is mobilizing a 90-ton hydraulic crane onto a commercial hospital site where recent grading left soft backfill over an old utility trench. Who is responsible under OSHA 29 CFR 1926.1402 for ensuring ground conditions are firm, drained, and graded before crane assembly or operation?
- An electrician needs to inspect wiring inside an open, energized 277-volt lighting junction box mounted 10 feet above a concrete floor, and grabs a 12-foot aluminum extension ladder from the gang box. Why must the safety technician stop the work and require a different ladder?
- An ironworker wearing a 6-foot shock-absorbing lanyard anchors at foot level on a steel beam only 12 feet above a lower concrete deck. Why must the safety technician stop the worker and require a higher anchor or self-retracting lifeline?
- An electrical crew erects a freestanding mobile welded-frame scaffold with a 5-foot base width to reach conduit 24 feet above a warehouse slab. What stability requirement applies under OSHA 29 CFR 1926.451(c)(1) before workers climb onto the platform?
- During a morning rigging inspection before hoisting steel roof trusses, a rigger pulls an alloy steel chain sling from the gang box and notices its metal capacity identification tag is missing. What action must the safety technician require?
- Painters finishing a commercial lobby wipe down woodwork with linseed oil and mineral spirits, leaving dozens of soaked rags on a cardboard box at the end of the shift. What disposal practice must the safety technician require to prevent a fire?
- A concrete crew uses a handheld power saw outdoors for two hours per shift to cut masonry pavers, strictly following every engineering control, work practice, and respiratory requirement listed in OSHA's silica Table 1. What is the employer's obligation regarding personal air monitoring for respirable crystalline silica?
- Two ironworkers are tying off their personal fall arrest systems to independent structural steel beam clamps 35 feet above a concrete deck, without a qualified person designing a custom engineered system. What minimum static load must each independent anchorage support under 29 CFR 1926.502?
- A crew needs to weld brackets inside a large underground concrete stormwater vault that currently requires a confined space entry permit due to welding fumes and limited egress. The foreman sets up a continuous blower fan and asks to reclassify the vault as a non-permit confined space. Why must the safety technician deny this request?
- Plumbers cut a 24-inch-square mechanical chase opening through a second-floor concrete deck above an active lobby, and a carpenter lays a loose sheet of scrap plywood over the hole. What must the safety technician require to bring this floor hole cover into compliance with OSHA 29 CFR 1926.502?
- Masons on a commercial school project are developing lower-back and shoulder soreness from repeatedly lifting heavy concrete blocks off low pallets and carrying them across an uneven slab. Applying ergonomic control principles, which change best reduces this musculoskeletal risk?
- Ironworkers are stick-welding structural steel columns on an open commercial floor while plumbers work twenty feet away without shaded welding helmets. What control must the safety technician require under OSHA 29 CFR 1926.351 to protect nearby trades from arc flash?
- A renovation crew is preparing to remove old insulation from a vacant warehouse attic where thick layers of dried pigeon and rodent droppings cover the joists. Which control strategy best protects workers from biological airborne hazards such as histoplasmosis or hantavirus?
- A commercial framing crew plans to use a powder-actuated fastening tool to shoot track pins into a cured concrete slab. Under OSHA 29 CFR 1926.302, what prerequisite must be met before any worker operates this tool?
- During a blind crane pick behind a concrete core wall, three ironworkers begin shouting and waving different hand signals at the crane operator at the same time. What rule must the safety technician enforce?
- While testing a steel water tank from outside before entry, a safety technician records an oxygen reading of 24.8 percent on a calibrated multi-gas meter. What should the technician require before anyone enters the tank?
- A geotechnical technician brings a portable nuclear moisture-density gauge onto an active highway grading project to test compacted soil layers. Which control strategy best minimizes ionizing radiation exposure for nearby grading crews?
- A masonry crew is laying an unreinforced 12-foot-high concrete block exterior wall on a windy commercial jobsite before roof framing is installed. Under OSHA 29 CFR 1926.706, what structural control is required once the wall exceeds 8 feet in height?
- While reviewing Safety Data Sheets and container labels for two concrete curing compounds on site, a safety technician sees that one product carries the signal word 'Danger' while the other carries 'Warning.' What does this distinction indicate under OSHA's Hazard Communication standard?
- A utility crew needs to enter a deep sump vault where pre-entry atmospheric testing measures 17.8 percent oxygen, and a worker offers to wear a tight-fitting half-mask air-purifying respirator equipped with organic vapor cartridges. Why must the safety technician prohibit entry with that respirator?
- A masonry foreman paints the tops and undersides of all wooden scaffold planks bright yellow so they are easy to spot in the laydown yard. Why must the safety technician remove those planks from service under 29 CFR 1926.451?
- Two millwrights and an electrician are repairing a concrete batch plant mixer, and the foreman places one padlock on the main disconnect and pockets the key for the group. What must the safety technician require instead?
- Carpenters are installing a job-built wooden perimeter guardrail system around an open third-floor concrete slab edge. Under 29 CFR 1926.502, what minimum force must the top edge of the guardrail withstand when applied in any outward or downward direction?
- Carpenters frame a temporary wooden jobsite stairway with six risers leading up to a commercial site trailer and leave both sides open without rails. What fall protection must the safety technician require on this stairway under 29 CFR 1926.1052?
- A concrete demolition laborer operates a pneumatic breaker in the morning, assists a skid-steer operator at midday, and works near a portable generator in the afternoon. Which monitoring instrument should the safety technician select to accurately determine the worker's full-shift time-weighted average noise exposure?
- An ironworker slips off a steel beam while tied off and is safely caught by a full-body harness and self-retracting lifeline without hitting the deck below. What must the safety technician require for the harness and lifeline involved in the fall?
- During a morning tool inspection on a damp concrete slab, a safety technician finds a 12-gauge extension cord with a missing ground prong and a nicked outer jacket exposing inner conductor insulation. What must the technician require?
- A rigging crew is guiding a 30-foot prefabricated steel stair flight into a tight building core using a tower crane in a light afternoon breeze. What work practice should the safety technician require to control load swing without placing workers in a crush zone?
- Electricians are installing conduit on an open mezzanine 18 feet above a busy main corridor where plumbers are staging copper pipe below, and loose couplings sit near the mezzanine edge. Beyond requiring hard hats, what control should the safety technician require to protect workers below from falling objects?
- An electrician rolls a 10-foot mobile welded-frame scaffold into position on a smooth concrete warehouse floor to install overhead conduit. What must be done before the worker climbs onto the platform to begin work?
- A rough-terrain forklift operator needs to step away from the machine for ten minutes to review delivery paperwork inside the site trailer while a pallet of concrete block sits on the forks. What must the operator do before leaving the forklift unattended?
- A demolition crew on the fourth floor of a commercial building plans to toss scrap drywall and framing lumber out a window 35 feet above an exterior courtyard into a roll-off container below. Under OSHA 29 CFR 1926.252(a), what must the safety technician require before debris removal starts?
- An electrician operating a boom-supported aerial lift cannot quite reach a ceiling junction box at maximum boom extension and places a 4-foot fiberglass stepladder inside the basket to gain extra height. What must the safety technician require?
- During a morning pre-use inspection, a sheet metal worker notices a cracked fiberglass side rail and a bent rung on a 10-foot stepladder. What must the safety technician require immediately under OSHA 29 CFR 1926.1053?
- A utility crew arrives at a new site to dig an 8-foot-deep sewer trench, and the foreman assumes the ground is stable Type A clay based on a neighboring project a mile away. What must a competent person do before selecting a trench protective system?
- A mechanical crew plans to hoist three full oxygen cylinders in a rack to the third floor using a crane and then store them upright in a staging bay overnight, with the regulators removed. Under OSHA 29 CFR 1926.350(a)(1), what must be in place on every cylinder?
- A municipal paving contractor assigns a laborer to flag haul trucks and public vehicles entering an active lane closure at dusk without supplemental lighting. What personal protective equipment must the safety technician require for the flagger?
- A pipefitter notices stiff threads on an oxygen cylinder regulator valve before torch cutting and reaches for a tube of bearing grease to lubricate the fitting. What must the safety technician require immediately?
- During a pre-lift rigging inspection on a structural steel job, a rigger spots a wire rope choker sling with localized crushing and birdcaging where the strands have unlaid into a cage-like bulge. What must the safety technician require before the lift proceeds?
- During a pre-task check on a commercial steel erection job, a safety technician sees a connector wearing a waist-only leather body belt clipped to a shock-absorbing lanyard for fall arrest 25 feet above a slab. What must the technician require immediately?
- During a basement build-out, an electrician hangs temporary string lighting across steel bar joists by tying the electrical cord directly to the joists with bare bulbs exposed at head height. What must the safety technician require under 29 CFR 1926.405?
- A utility crew is installing storm pipe in a 7-foot-deep trench where groundwater is actively seeping and pooling around the workers' boots. What must the safety technician require under 29 CFR 1926.651 before work continues inside the trench?
- After saw-cutting expansion joints in a cured warehouse floor, a concrete crew grabs push brooms to dry-sweep the fine gray dust into piles before lunch. What must the safety technician require under OSHA 29 CFR 1926.1153(f)?
- While a tower crane suspends a bundle of rebar 20 feet in the air waiting for a landing zone to clear, two plumbers start walking directly underneath the suspended bundle to reach a tool gang box. What must the safety technician require under OSHA 29 CFR 1926.1425?
- While pulling low-voltage cable above a drop-ceiling grid, an electrician stands with both feet on the very top cap of an eight-foot fiberglass stepladder to reach a J-hook. What must the safety technician require under OSHA 29 CFR 1926.1053(b)(13)?
- During a morning walkthrough on a masonry project, a safety technician sees two laborers climbing the X-shaped diagonal cross-braces of a three-tier welded-frame scaffold instead of using the attached access ladder. What must the technician require under 29 CFR 1926.451?
- A utility crew is digging a 5.5-foot-deep trench in cohesive clay soil to repair a storm drain and plans to work inside for only fifteen minutes without shoring or sloping. Under OSHA 29 CFR 1926.652, what must the safety technician require?
- A concrete restoration crew is preparing to enter a dusty containment zone where tight-fitting half-mask respirators are required, and every worker passed an annual fit test four months ago. What must the safety technician ensure happens each time a worker puts on a respirator?
- An electrician needs to pull low-voltage cable above a hallway ceiling where a narrow corridor blocks opening a 6-foot fiberglass stepladder, so the worker folds the ladder flat and leans it against the drywall. What must the safety technician require?
- A flooring crew will apply a strong aromatic solvent adhesive for four hours inside a mechanical room, and the foreman hands out standard disposable latex exam gloves from the first-aid cabinet. What must the safety technician require for hand protection?
- A welder preparing to work inside an enclosed steel tank complains that the interior feels stuffy and asks to crack open an oxygen cylinder valve to freshen the air while waiting for a blower. What must the safety technician require immediately?
- A safety technician is reviewing the 16-section Safety Data Sheet for a two-part epoxy floor coating to verify the OSHA permissible exposure limit, ventilation requirements, and chemical-resistant glove specifications before work starts. Which SDS section contains this information?
- A crew is applying an epoxy solvent coating in a semi-enclosed mechanical room where low-level toxic vapor exposure is the primary health concern rather than an explosive atmosphere. Which air-monitoring instrument is most appropriate for screening parts-per-million organic vapors?
- A utility contractor is backfilling a 7-foot-deep sewer trench with a skid-steer loader whose operator cannot see the top edge of the excavation from the cab. What control must the safety technician require under OSHA 29 CFR 1926.651?
- A demolition contractor is preparing to tear down a vacant two-story commercial building that still has active natural gas, electric, and water connections. What must the employer ensure before demolition work begins under 29 CFR 1926.850?
- A demolition crew connects a 90-psi pneumatic pavement breaker to a portable air compressor using quick-connect hose couplings across an active concrete slab. What safeguard must the safety technician require on the air hose connections under 29 CFR 1926.302?
- During a pre-shift gear check on a commercial steel erection job, an ironworker pulls a full-body harness from a gang box and notices frayed webbing and heat-damaged stitching near the dorsal D-ring. What must the safety technician require?
- While rigging a steel beam for a crane pick, a rigger discovers that a 1-inch alloy shackle is missing its threaded pin and suggests inserting a matching Grade 8 hex bolt from the gang box. What must the safety technician require?
- Before a grading subcontractor begins compacting a sloped highway embankment with a ride-on vibratory roller, a safety technician inspects the machine and finds a missing seat belt and a damaged canopy frame. The roller was manufactured after July 15, 2019. What control must be in place before the operator puts the roller into service on the slope?
- Painters applying an epoxy coating inside a mechanical room wear tight-fitting half-mask air-purifying respirators with organic vapor cartridges that lack an end-of-service-life indicator. How must the employer ensure workers do not inhale breakthrough vapors when the cartridges saturate?
- A commercial roofing crew is installing insulation and membrane on a flat warehouse roof 22 feet above the ground using a warning line system combined with a safety monitoring system. At what minimum distance from the roof edge must the warning line be erected on all sides where mechanical equipment is not being used?
- Ironworkers are decking an open atrium roof where guardrails and personal fall arrest anchorages are not feasible for one bay, so the contractor elects to install a perimeter and under-deck safety net system. Under OSHA 29 CFR 1926.502, what is the maximum vertical distance allowed below the walking or working surface for installing the safety net?
- During interior drywall finishing on a commercial office build, a crew cannot quite reach the ceiling grid from a single-tier rolling scaffold platform and places two overturned five-gallon joint-compound buckets on the deck to stand on. What must the safety technician require immediately?
- An excavator is lowering a heavy cast-iron manhole ring into a 6-foot-deep utility trench while two pipefitters wait inside the trench directly beneath the bucket's swing path to guide it into place. What must the safety technician require before the lift proceeds?
- A concrete crew is floating an elevated parking deck slab along a perimeter edge where a 16-foot handle could contact an energized overhead distribution line, and a finisher reaches for an aluminum bull float handle. Which control must the safety technician require before floating begins?
- During wood-frame wall assembly on a commercial apartment project, a carpenter using a pneumatic framing nailer accidentally double-fires a nail into an adjacent stud after the gun recoils off a knot. Which equipment control best prevents unintended bump-fire discharges?