Quiz 8 Question 3 of 20

During a pre-lift rigging inspection on a structural steel job, a rigger spots a wire rope choker sling with localized crushing and birdcaging where the strands have unlaid into a cage-like bulge. What must the safety technician require before the lift proceeds?

Select an answer to reveal the explanation.

Motivation