A mobile crane is setting steel roof trusses in a tight commercial courtyard where laborers frequently walk past the rear of the carrier to reach a material laydown area. What control must be established under OSHA 29 CFR 1926.1424 to protect workers from being struck or crushed by the counterweight?
Select an answer to reveal the explanation.
Short Explanation
You’re right to focus on the space behind the crane, where the counterweight can create a serious pinch hazard. Barricades or warning lines around the full swing radius keep workers out; painted outrigger pads and high-visibility vests do not create that boundary.
Full Explanation
Under OSHA 29 CFR 1926.1424, employers must keep workers clear of a crane’s rotating superstructure hazard area. Erecting barricades or warning lines around the crane’s rotating swing radius establishes a visible boundary that keeps pedestrians away from the counterweight’s struck-by and pinch zones, including areas the operator may not see. Assigning a spotter only when the crane lifts over occupied trailers does not address the hazard during other rotations; the counterweight can swing regardless of what is beneath the boom tip. Painting yellow stripes directly on the crane’s rubber outrigger pads does not block foot traffic or mark the full counterweight arc, since the pads are not a barrier around the swing path. Requiring ground workers to wear high-visibility vests inside the zone may help them be seen, but apparel does not keep them out of the danger area or prevent crushing. Under 29 CFR 1926.1424(a)(3), before an employee goes to a location in the hazard area that is out of the operator’s view, the employee, or someone the employee instructs, must ensure the operator is informed. If the operator knows an employee is in a hazard area covered by 1926.1424(a)(1), the operator must not rotate the superstructure until informed, through a pre-arranged communication system, that the employee is in a safe position. This is not a requirement to get confirmation that the crane will not rotate before every entry into the swing radius. As a practical check after setup, walk the perimeter and confirm that warning lines or barricades mark the full counterweight arc and keep pedestrian access outside it.
Prefer to study offline? Printable PDF study book + test engine ($7.50, unofficial). These questions stay free here.