Quiz 9 Question 10 of 20

A concrete crew is floating an elevated parking deck slab along a perimeter edge where a 16-foot handle could contact an energized overhead distribution line, and a finisher reaches for an aluminum bull float handle. Which control must the safety technician require before floating begins?

Select an answer to reveal the explanation.

Motivation