2 Hazard Identification and Control
STSC · 85 questions
- On a three-story concrete office build, a carpenter foreman finds a 24-inch-square mechanical shaft opening covered by a loose sheet of plywood with no markings. What must the foreman have the crew do to make the cover compliant?
- A roofing foreman inspects a portable extension ladder set up to access a 16-foot-high commercial roof edge and sees the side rails end flush with the parapet flashing. What must the foreman require before anyone climbs the ladder?
- Before hoisting steel roof joists with a mobile crane, a rigging foreman notices a synthetic web sling has frayed load-bearing stitching. What must the foreman do with the sling?
- While walking a multi-story commercial jobsite, a masonry foreman notices a 14-foot-high supported scaffold platform has a top rail installed, but the midrail is missing along the work side and no workers are tied off. What should the foreman do?
- After an overnight heavy rainstorm, a utility crew returns to a 7-foot-deep trench that now holds standing water at the bottom and shows small soil sloughs along one wall. What must the foreman ensure before anyone enters?
- A civil crew foreman is preparing to excavate a 4-foot-deep storm drain lateral across an existing commercial parking lot, and the site superintendent says the as-built drawings from 1998 show no buried lines in that lane. What should the foreman do before the excavator breaks ground?
- A utility crew foreman on a commercial site notices the excavator operator is placing trench spoil right up against the top edge of a 6-foot-deep water-line trench to save swing time. What should the foreman do first?
- A mobile crane is scheduled to hoist rooftop HVAC units near an energized overhead distribution line, and the operator suggests having a laborer watch the boom by eye. What must the foreman do?
- A millwright foreman needs a crew member to clear a jammed aggregate conveyor belt on a highway paving plant, and the operator says the start button at the control shack is switched off. What must the foreman require before anyone reaches into the roller?
- While walking a residential framing site, a carpenter lead sees piles of scrap form lumber with protruding nails scattered across the main walkway between the material laydown yard and the foundation. What must the lead require?
- On a tight urban utility project, a tracked excavator is digging beside a concrete retaining wall where laborers frequently walk behind the machine to fetch pipe fittings. What control must the foreman establish?
- A concrete foreman notices uncapped vertical #5 rebar dowels protruding 18 inches above a grade-beam footing right beside a walkway where laborers carry formwork panels. What must the foreman have the crew do?
- During a damp concrete slab pour, a carpenter foreman sees a worker plugging a corded circular saw into a temporary 120-volt spider box receptacle whose GFCI test button is broken, with no assured equipment grounding program on site. What should the foreman require?
- A utility crew is installing sewer pipe inside a 6-foot-deep, 80-foot-long trench that has only one extension ladder placed at the east end. What must the foreman require before workers continue working near the west end?
- At the end of a framing shift, a carpenter picks up a shop air hose connected to a portable compressor and begins blowing sawdust off their shirt and forearms. What should the supervisor do?
- While installing exterior curtain-wall clips from an articulating boom lift, an ironworker clips a personal fall arrest lanyard to an adjacent structural steel column instead of the basket anchor to get extra reach. What should the supervisor do?
- While checking temporary power on a commercial tenant buildout, an electrical foreman finds a 12-gauge extension cord powering a miter saw with its ground prong snapped off and a deep nick exposing inner conductor insulation. What must the foreman do?
- On a four-story commercial facade project, a glazing foreman notices workers installing curtain-wall brackets on the third floor directly above an active pedestrian walkway where crews carry materials below. What should the foreman do?
- A civil site foreman notices a tandem-axle haul truck preparing to back down a narrow access lane toward a pipe crew, and the truck's backup alarm is silent while the driver has an obstructed rear view. What must the foreman require before the truck moves in reverse?
- While inspecting a three-tier supported tube-and-coupler scaffold erected on compacted soil along a commercial exterior wall, a masonry foreman sees the scaffold legs resting directly on hollow concrete blocks. What must the foreman require before workers use the scaffold?
- A crane is hoisting a 2,000-pound precast concrete lintel into place on a second-story wall, and a laborer steps onto the open deck edge to grab the lintel's steel lifting eye by hand to stop it from spinning. What should the rigging foreman require instead?
- During a structural steel retrofit, a metal-fabrication supervisor sees an ironworker preparing to cut anchor bolts with a 7-inch angle grinder whose protective wheel guard has been removed to fit into a tight corner. What must the supervisor require?
- During an interior framing walk, a carpenter foreman notices a framer has wedged a wooden shim into the lower blade guard of a corded circular saw so the guard stays retracted. What should the foreman do?
- While a mobile crane hoists a bundle of steel roof decking across a warehouse footprint, two ironworkers walk directly beneath the suspended bundle to reach the tool trailer faster. What must the foreman do?
- On a civil pipeline job, a delivery crew stacks 18-inch-diameter coated steel pipe three tiers high on bare ground next to the crew parking area without any side restraints. What must the foreman require?
- During structural steel erection on a commercial gym, an ironworker uses bare fingers to feel whether bolt holes align between a column splice and a suspended girder while the crane holds the load. What should the foreman require instead?
- On a two-story brick facade project, a masonry foreman sees a laborer climbing the diagonal X-braces of a supported frame scaffold to reach the second-tier platform instead of walking to the end frame's attached ladder. What should the foreman do?
- While backing a skid-steer loader down a narrow alley between material laydown racks, the operator loses sight of the assigned ground spotter behind a stack of conduit. What must the operator do immediately?
- Before hoisting steel pipe racks on a commercial site, a rigging foreman inspects an alloy steel chain sling and finds its permanently affixed capacity identification tag is missing. What must the foreman do?
- A drywall foreman inspects a 20-foot portable extension ladder leaned against a 16-foot concrete block wall and sees its base sits 8 feet from the wall on smooth concrete. What must the foreman require before anyone climbs?
- A utility crew opens a 6-foot-deep trench in previously disturbed sandy soil to repair a water main, and the operator says the walls look vertical and firm enough for a quick 20-minute valve swap. What must the foreman require before anyone enters?
- During a winter commercial remodel, a crew brings four 100-pound LP-gas cylinders inside the building overnight and stores them beside the main stairwell exit to keep them from freezing. What must the foreman require?
- While installing overhead fire-sprinkler mains from a raised scissor lift, a pipefitter climbs onto the lift's midrail to gain an extra 18 inches of reach to tighten a hanger. What must the mechanical foreman order?
- While checking a framing crew's generator staging area, a supervisor sees laborers pouring gasoline from an unvented household plastic jug with a loose screw cap. What must the supervisor require?
- Three electricians must pull feeders inside a large switchgear cabinet fed by a main breaker, and the lead electrician offers to put a single personal padlock on the disconnect so the others can work faster. What must the electrical foreman require?
- A rigging foreman plans to hoist an 8,000-pound rooftop chiller using a two-leg wire-rope bridle sling, and a rigger suggests shortening the legs to a shallow 20-degree horizontal angle to gain extra hook height. Why must the foreman reject that shallow sling angle?
- A mobile crane arrives at a residential subdivision to set roof trusses, and the operator prepares to extend the outriggers directly onto rain-softened topsoil near a backfilled foundation wall. What must the foreman require before the crane lifts?
- Before hoisting bundles of steel studs with a mobile crane, a rigging foreman notices the spring-loaded safety latch on the crane's main hoist hook is bent and will not close across the throat opening. What must the foreman require?
- During interior framing, a carpenter holds a corded circular saw between their knees with the plug still connected to an energized extension cord while loosening the arbor nut to change a dull blade. What must the foreman require?
- A paving crew is milling an active two-lane city street, and a newly assigned flagger stands inside the live traffic lane without high-visibility apparel while holding a red cloth flag to slow approaching cars. What must the paving foreman require immediately?
- During an interior warehouse buildout, two painters ask a helper to push their 10-foot-high rolling scaffold down the aisle while they remain standing on the platform to save time. What must the foreman require?
- A roofing crew is installing membrane around six domed plastic skylights on a flat commercial roof, and workers are stepping directly beside the frames without fall arrest gear. What must the foreman require?
- While working near a fourth-floor perimeter edge to install exterior sheathing, an apprentice clips a personal fall arrest lanyard directly to the top rail of a wooden job-built guardrail. What must the foreman require?
- Before a municipal utility crew enters an existing 14-foot-deep storm-sewer junction chamber, a foreman prepares a multi-gas monitor to test the atmosphere at multiple levels. In what order must the atmospheric hazards be tested?
- A steel erection crew is rigging heavy I-beams with sharp flange edges using nylon web slings without corner protection. What must the rigging foreman require before lifting?
- On a civil grading site, a supervisor sees a vibratory roller operator compacting an embankment slope without wearing the seatbelt inside the machine's Rollover Protective Structure (ROPS) cab. What must the supervisor require?
- While installing ceiling grid wire in a retail tenant space, an apprentice stands with both feet on the top cap of an eight-foot fiberglass stepladder to reach a concrete deck anchor. What must the foreman require immediately?
- A masonry crew sets up a gasoline-powered portable mortar mixer beside a concrete block wall, and the foreman notices the side sheet-metal guard covering the drive belt and pulleys is missing. What must the foreman require before mixing begins?
- A utility crew is excavating a six-foot-deep trench for a new water main directly beside an old underground fuel storage tank and a leaking sanitary sewer lateral. What must the foreman require before any worker enters the trench?
- While framing a commercial roof deck, a carpenter wearing a personal fall arrest harness plans to anchor their self-retracting lifeline 20 feet horizontally to the side of their work zone to avoid moving the anchor point. What should the framing foreman require?
- A roofing subcontractor arrives on a commercial roof project wearing vintage leather waist body belts clipped to vertical lifelines for personal fall arrest. What must the site supervisor require before anyone accesses the roof?
- A general contractor is mobilizing a crew to demolish a two-story masonry annex attached to an older warehouse. What must the site supervisor verify is completed before any demolition work begins?
- A mechanical foreman must install 30-foot-long chilled-water valve manifolds 22 feet above a warehouse slab, and the crew plans to bolt the heavy assemblies together piece by piece from ladders. Applying the hierarchy of controls, what is the foreman's best approach?
- While framing interior partitions, a carpenter's pneumatic nail gun jams mid-strip, and the carpenter reaches toward the nosepiece with a screwdriver while the air hose remains connected. What must the foreman order immediately?
- At the end of an interior welding shift, a mechanical foreman sees two disconnected oxygen cylinders standing freely near a busy corridor without valve caps. What must the foreman require before leaving the area?
- During a retail store remodel, an electrical foreman sees an apprentice setting up an aluminum stepladder directly in front of an energized 277/480-volt lighting panel to pull branch-circuit wire. What must the foreman require?
- While two utility workers are inside a permit-required sewer manhole bolting pipe flanges, the assigned confined-space attendant asks the foreman for permission to walk to the tool trailer for ten minutes to sort fittings. What must the foreman require?
- While inspecting a masonry crew's tool gang box, a foreman finds two cold chisels with flattened, mushroomed striking heads and a sledgehammer with a split hickory handle. What must the foreman require before work starts?
- A masonry foreman is about to start laying a 12-foot-high concrete block wall that is not yet braced, while carpenters are framing an adjacent interior partition nearby. What must the foreman establish before laying block?
- The approved temporary traffic control plan includes a longitudinal buffer space after the taper. Why must the foreman keep the paver and crew out of that buffer?
- While moving palletized brick across an uneven commercial site, a telehandler operator raises the loaded forks six feet above the ground to see better while turning onto a sloped ramp. What must the foreman order immediately?
- A civil foreman excavating a 9-foot-deep utility trench parallel to an existing brick retail building's shallow footing notices loose soil raveling beneath the footing edge. What must the foreman require before excavation continues?
- During a pre-shift fall protection inspection on a commercial steel frame, an ironworker foreman notices a worker's full-body harness has a deployed stitched impact indicator and weld-spatter burns on the dorsal webbing. What must the foreman require?
- A demolition crew is mobilizing to tear down a vacant single-story retail building, and the crew lead wants to start knocking down interior partition walls while the water, natural gas, and electrical services remain connected for temporary lighting. What must the site supervisor require before demolition begins?
- While a mobile crane hoists a bundle of metal roof decking toward the third floor, a laborer near the laydown yard spots a frayed wire rope wrapping on the drum and gives the emergency stop hand signal, even though the laborer is not the assigned signalperson. What must the crane operator do?
- During a busy commercial interior buildout, an electrical foreman notices a framing crew has stacked bundled steel studs and a job gang box directly in front of an energized 277/480-volt main distribution panel. What must the foreman require?
- Before hoisting a bundle of steel rebar with a tower crane, a rigging foreman inspects a wire rope sling and discovers a section with severe kinking and birdcaged strands. What must the foreman do with the sling?
- On a commercial concrete build, carpenters install a temporary wooden stairway with six risers between the ground slab and a raised loading dock, leaving both sides completely open. What must the supervisor require before crews use the stairs?
- During an interior commercial buildout, a supervisor notices temporary string lights hanging directly by their electrical cords from steel ceiling wire with bare, unguarded bulbs above a busy walkway. What must the supervisor require?
- While a crew installs ductile-iron water main inside a 6-foot-deep shored trench, the excavator operator swings a suspended 20-foot pipe section over the trench box while a pipefitter crouches directly underneath to guide the bell end. What must the utility foreman order?
- During a busy commercial interior buildout, temporary 120-volt extension cords powering drywall screw guns run across a main concrete corridor where heavy pallet jacks and scissor lifts roll continuously. What must the electrical foreman require?
- A mechanical foreman assigns an HVAC technician to work on a 12-foot-high mezzanine edge using a full-body harness and a standard 6-foot shock-absorbing lanyard anchored at foot level. Why must the foreman change the fall protection plan?
- A concrete crew is pouring and bull-floating a commercial parking lot apron directly beneath energized 13.8-kilovolt overhead distribution lines, and the crew brings out long-handled aluminum bull floats. What must the foreman require?
- A site mechanic prepares to crawl beneath a raised skid-steer loader bucket to grease a hydraulic cylinder pin while the engine is shut off and the hydraulic control lever is in neutral. What must the foreman require before work starts?
- While unloading structural steel on a commercial build, a crane operator begins hoisting a bundle of beams that sits 15 feet outside the boom tip's vertical line, intending to drag it sideways across the concrete slab. What must the rigging foreman order immediately?
- During a fourth-story commercial interior demolition, a crew plans to drop broken drywall and scrap lumber 38 feet straight down from an exterior window opening into a ground-level debris bin below. What must the supervisor require?
- While inspecting a masonry staging area on a commercial build, a supervisor sees pallets of 80-pound mortar bags stacked 8 feet high in straight vertical columns that are starting to lean. What corrective action should the supervisor direct?
- On the third floor of an apartment framing project, carpenters cut out a 6-foot-wide window opening whose bottom sill sits 18 inches above the floor, leaving an exterior drop of 24 feet. What must the foreman install before work continues near the opening?
- While excavating a 5-foot-deep utility trench across a commercial site, a crew uncovers an active 4-inch PVC water main running horizontally across the open trench wall. What must the foreman require while the trench remains open?
- Before sending a crew into an underground concrete storm-water chamber, a utility foreman sets up a portable forced-air ventilation blower directly beside an idling diesel air compressor. What must the foreman correct before ventilation begins?
- At the end of a concrete form strip, two laborers climb onto the side step and empty forks of a moving telehandler to catch a ride back to the job trailer 300 yards away. What must the site supervisor order immediately?
- An ironworker brings a new box of abrasive cutoff wheels to a portable 7-inch angle grinder station during a structural steel retrofit. Which verification must the supervisor ensure is completed before a wheel is mounted?
- A municipal utility crew is preparing to enter a 16-foot-deep vertical sewer manhole designated as a permit-required confined space for pump maintenance, and the foreman plans to have the attendant stand at the rim with only a cell phone. What must the foreman require before entry?
- While rigging a 3,500-pound steel beam for a crane pick, a rigger discovers the screw pin on a bow shackle is missing and offers to thread a Grade 8 hex bolt through the ears instead. What must the rigging foreman require?
- While walking a commercial framing floor, a carpentry supervisor sees a worker ripping narrow plywood strips on a portable table saw with the blade hood guard, spreader, and anti-kickback dogs removed. What should the supervisor do first?