Quiz 6 Question 20 of 20

While a crew installs ductile-iron water main inside a 6-foot-deep shored trench, the excavator operator swings a suspended 20-foot pipe section over the trench box while a pipefitter crouches directly underneath to guide the bell end. What must the utility foreman order?

Select an answer to reveal the explanation.

Motivation