Quiz 5 Question 1 of 20

A utility crew opens a 6-foot-deep trench in previously disturbed sandy soil to repair a water main, and the operator says the walls look vertical and firm enough for a quick 20-minute valve swap. What must the foreman require before anyone enters?

Select an answer to reveal the explanation.

Motivation