Quiz 4 Question 11 of 20

A crane is hoisting a 2,000-pound precast concrete lintel into place on a second-story wall, and a laborer steps onto the open deck edge to grab the lintel's steel lifting eye by hand to stop it from spinning. What should the rigging foreman require instead?

Select an answer to reveal the explanation.

Motivation