II Audit Process
CQA · 90 questions
- Following an internal audit finding on solder-paste thickness defects, the production manager submits a corrective action response stating that all affected boards were reworked and the stencil was cleaned. What should the auditor do before accepting this response?
- While auditing an aerospace CNC machining cell, an auditor notices a digital micrometer with an expired calibration sticker. The operator states that the tool was calibrated last week and that the quality technician simply forgot to update the label. What should the auditor do to establish objective evidence?
- During a two-day internal audit of an insurance claims center, an auditor discovers three systemic nonconformities on the first afternoon. When should the auditor first inform the auditee's process owner about these findings?
- During a scheduled process audit of a sterile pouch sealing line at a medical device manufacturer, an auditor notices a second automated heat-sealing machine in an adjacent bay that is not listed on the approved audit plan. What should the auditor do first?
- During an on-site audit of a beverage bottling line, an auditor checks three morning-shift pasteurization logs and finds one missing operator verification signature. The line supervisor says it was a one-time oversight during a shift handoff. What should the auditor do next?
- Six months ago, an audit at an automotive stamping supplier found that press operators skipped first-piece dimensional checks during die changeovers. In response, the supplier retrained all operators and revised the work instruction. During follow-up verification, what provides the strongest evidence that the corrective action is effective?
- At the conclusion of a three-day quality audit at a food-processing plant, the lead auditor convenes department managers for the closing meeting. Which action best fulfills the purpose of this meeting?
- At the start of a two-day quality audit at a sterile fill-finish facility, the lead auditor convenes department heads and escorts before beginning floor observations. Which action is the primary purpose of this opening meeting?
- Before traveling to a diagnostic reagent plant for a three-day audit, the lead auditor reviews the facility's quality manual, document-control procedure, and recent management review minutes to verify whether the documented system addresses all applicable audit criteria. Which audit activity is the lead auditor performing?
- While preparing for an audit of a chemical blending facility, an auditor builds a checklist of regulatory and procedural requirements. How should the auditor use this checklist during on-site fieldwork?
- While auditing a pharmaceutical packaging line, an auditor observes two operators skipping line-clearance sign-offs required by the batch-record SOP. Which element must the auditor include when drafting the formal nonconformity statement?
- While auditing a ready-to-eat salad packaging line, an auditor reads a detailed sanitation procedure specifying hourly metal-detector verification checks with certified test wands. What is the strongest way for the auditor to gather objective evidence of compliance?
- Two days after a closing meeting at a food-packaging plant, the plant manager emails the lead auditor to dispute a documented nonconformity on metal-detector verification logs, claiming the auditor misunderstood the shift schedule. What is the most appropriate action for the lead auditor?
- During a quality system audit of a medical-device contract manufacturer, an auditor checks ten recent device history records across three product families and finds that four records lack required final-inspection release signatures, even though the procedure mandates sign-off before shipment. How should the auditor classify this finding?
- A lead auditor is preparing for a scheduled three-day quality audit of a contract electronics assembler, but learns that the plant's quality manager, calibration records, and primary test area will be unavailable due to a facility relocation during that week. What should the lead auditor do first?
- Sixty days after an internal audit of a hospital sterilizer unit, the process owner has missed two promised target dates for submitting a root-cause analysis and corrective action plan. What should the lead auditor or program manager do next?
- During an audit of a high-volume surgical-glove dipping line, an auditor wants to ensure every production lot has an equal, unbiased chance of selection when estimating overall batch-record compliance across the past quarter. Which sampling approach should the auditor use?
- During an audit of a cold-chain pharmacy hub, a warehouse lead explains in an interview that temperature-sensitive shipments are always moved into refrigerated staging within ten minutes of unloading. Which step provides the strongest corroboration of this practice?
- A lead auditor has finished the preliminary document review for a two-day quality system audit of a three-shift medical plastics molder. Before arriving on site, what should the lead auditor prepare to coordinate the team and auditee departments?
- During a process audit of a dietary-supplement manufacturer, an auditor selects a recent customer complaint about an off-odor bottle and traces its batch number back through packaging, blending, and raw-material receiving records. What audit technique is the auditor using?
- While auditing a hospital billing department, an auditor verifies that staff follow every step of the documented invoice-review procedure with zero errors, but notices that manual data re-entry slows processing. How should the auditor record this observation?
- Halfway through a scheduled one-day internal audit of a food-packaging plant, a municipal water-main break forces the facility to suspend production and evacuate non-essential staff for the afternoon. What should the lead auditor do?
- Two days after the closing meeting for an internal audit of a regional blood-bank testing laboratory, the lead auditor finishes minor grammatical edits to the draft report without altering any findings. What should the lead auditor do next?
- A food-processing plant recently switched to a new allergen-cleaning chemical on Packaging Line 3. During a targeted process audit of allergen control, which sampling strategy should the auditor use to verify the change?
- After an audit finding on frequent mislabeled shipping cartons, a warehouse manager submits a corrective action plan stating the root cause was 'operator carelessness' and the action is 'retrain all packers.' What should the auditor do when reviewing this response?
- During a process audit of an automotive battery assembly plant, an auditor selects a specific incoming lot of separator film at the receiving dock and follows its documentation through slitting, cell winding, electrical testing, and final shipping release. Which audit technique is the auditor using?
- During an on-site audit of a commercial bakery, an auditor observes an unsealed allergen-ingredient bin left open next to a non-allergen mixing line. The line supervisor immediately seals and labels the bin while the auditor watches. How should the auditor handle this observation?
- While auditing batch-release records at a dietary-supplement plant, an auditor reviews fifteen records, finds fourteen fully compliant and one missing a final QA signature, and writes notes only for the single defective record. Why should the auditor also log identifiers for the fourteen compliant records?
- During a scheduled second-party audit of a contract sterilizer, the site quality manager refuses to let the auditor inspect the previous quarter's biological-indicator failure log, citing internal legal review. What should the auditor do next?
- During an audit of a multi-product contract electronics assembler, the auditor must review solder-joint inspection records across three lines: a high-volume consumer line, a moderate-volume industrial line, and a low-volume aerospace line with strict reliability specs. Which sampling approach ensures proportional and risk-appropriate coverage across all three lines?
- While auditing a commercial food-canning line, an auditor notices that an inline retort temperature recorder has been bypassed with a jumper wire while cans are actively being sterilized. What should the auditor do immediately?
- During a process audit of an electronics assembly line, an auditor checks the torque specification posted at Workstation 4 and notices it is Revision B, while the controlled master document register lists Revision D as current. What should the auditor do next?
- A lead auditor is finalizing the audit report after a three-day quality system audit of a commercial printing plant. Beyond listing individual nonconformities and observations, what must the audit report include to give management a complete assessment?
- An audit team is scheduled to conduct a two-day remote quality audit of a software-as-a-service healthcare vendor across three time zones. What should the lead auditor arrange with the auditee before the opening meeting to prevent fieldwork delays?
- A precision-stamping supplier closed an audit nonconformity by installing optical sensors on its press line to prevent double-blank feeding and updating its setup checklist. How should the lead auditor verify closure of this corrective action?
- During an audit of a food-safety testing laboratory, an analyst demonstrates that temperature-monitoring data are exported daily into a shared spreadsheet where supervisors can overwrite entries without leaving a change history. What is the primary audit concern with this practice?
- During an audit of a precision machining shop, an auditor learns that a coordinate measuring machine was found out of tolerance during its annual calibration last month. The shop recalibrated the machine and resumed use without reviewing parts measured since the prior check. What should the auditor cite?
- While auditing a medical-device soldering station, an auditor reviews signed classroom attendance sheets for a revised work instruction, yet observes two operators using the superseded flux method. What should the auditor evaluate next?
- An internal audit previously cited Packaging Line 1 for missing heat-seal temperature checks. During CAPA verification, the auditor sees Line 1 is fixed, but finds the same gap on Lines 2 and 3, which use the same equipment and SOP. What should the auditor do?
- Midway through a scheduled one-day process audit of an automotive stamping plant, the lead auditor learns that Press Line 2—scheduled for live afternoon observation—is unexpectedly shut down for hydraulic repair. How should the lead auditor adjust the audit execution?
- During the closing meeting of an internal quality audit at a precision-casting plant, the foundry manager insists that a documented nonconformity on furnace calibration logs is invalid, even after reviewing the objective evidence. How should the lead auditor handle this unresolved disagreement?
- During a process audit of a continuous three-shift beverage bottling plant, an auditor wants to inspect 30 batch records out of 600 produced last month so that every day and shift is evenly represented without manual bias. Which sampling approach best meets this goal?
- During a quality system audit of a medical-device manufacturer, a lead auditor selects a single finished catheter lot and traces its documentation backward and forward through receiving, sterilization, assembly, and final release across multiple departments. Which audit approach is the auditor using?
- During a two-day quality system audit of a custom aerospace cable assembler, a lead auditor wants to verify whether document control and employee training rules are consistently applied across receiving, braiding, termination, and final test. Which auditing approach is specifically designed for this cross-departmental check?
- A lead auditor is preparing the detailed audit plan for a three-day assessment of a pharmaceutical packaging plant using a four-person audit team. Which criterion should primarily govern how the lead auditor assigns specific departments to each team member?
- While planning fieldwork for a quality audit of a high-volume contract packager, a junior auditor proposes reviewing a flat 10% of all batch records across every packaging line regardless of product risk or defect history. How should the lead auditor adjust this sampling approach?
- While planning a two-day internal quality audit of a medical-device assembly plant, the lead auditor notices that last year's audit closed three findings on incoming inspection and training records. How should the lead auditor incorporate those prior audit results into the current audit plan?
- While preparing for a process audit of an automated tablet-compression line, an auditor wants to structure fieldwork questions so that equipment maintenance, operator qualifications, acceptance criteria, and performance metrics are all examined together. Which preparation approach best supports this goal?
- During an audit of an aerospace metrology lab, an auditor inspects the master gauge blocks used to calibrate shop-floor micrometers. The blocks carry a valid internal sticker, but the lab has no certificate linking them to a recognized national or international standard. What should the auditor conclude?
- While auditing a food-packaging plant's annual management review, an auditor sees a signed attendance sheet and a slide deck summarizing customer complaints and audit trends, but no recorded decisions, assigned owners, or resource actions. How should the auditor evaluate this evidence?
- Sixty days after a process audit cited a medical-device contract packager for operators bypassing heat-sealer temperature alarms, the supplier submits revised work instructions and training sign-off sheets for closure. Which follow-up action should the lead auditor take?
- One day after the closing meeting of an internal quality audit at a diagnostics laboratory, a supervisor emails the lead auditor a previously missing batch of failed calibration records from the audited period. The final audit report has not yet been issued. What should the lead auditor do next?
- An audit team must evaluate a regional diagnostic clinic network that operates twelve outpatient branches under one centralized quality management system. How should the lead auditor structure the multi-site audit plan to achieve reliable coverage within a fixed two-week schedule?
- A contract aerospace manufacturer is three months into a twelve-month customer transition from Revision C to Revision D of a fastener-torque specification. Before starting fieldwork, how should the lead auditor establish the audit criteria for active production lots?
- During CAPA verification for a medical-device manufacturer, an auditee shows an approved IT change ticket scheduling an automated ERP interlock for six months from now and asks the auditor to close the nonconformity immediately. What should the auditor do?
- After an internal audit cited a food-packaging plant for slow metal-detector reject verification, the maintenance team sped up the reject-pusher air cylinder to close the finding. During CAPA verification, what must the auditor check beyond confirming faster pusher actuation?
- During the final afternoon of a two-day supplier audit at a contract electronics manufacturer, the auditee cannot locate calibration certificates for two active test fixtures and asks the lead auditor to delay recording the gap for two weeks while searching off-site archives. What should the lead auditor do before the closing meeting?
- During the opening meeting of a scheduled two-day internal quality system audit at a medical-device assembly plant, the operations director asks the lead auditor to exclude the incoming-inspection warehouse because a new supervisor started two weeks ago. What should the lead auditor do?
- During an annual quality system audit of a custom medical-laser manufacturer, the auditor learns that only four engineering design changes were processed during the entire twelve-month audit period. Which sampling approach should the auditor use for those design changes?
- While reviewing draft working papers from a three-day audit of a medical-device sterilizer, the lead auditor sees a note reading 'Lot 408 failed bioburden review—major finding,' with no reference to the record ID, specification, or interview source. Why must this working paper be revised before closing?
- After an internal audit finds frequent missing torque marks on assembled brake calipers, the production manager submits a corrective action plan that adds a second full-time inspector at the end of the line to check every caliper visually. Why should the auditor challenge this corrective action plan?
- During a multi-auditor quality system audit at a medical-device manufacturer, an auditor assigned to the receiving dock notices an uncalibrated torque driver on an adjacent subassembly bench outside their assigned area. What should the auditor do first?
- During a one-day process audit of a pharmaceutical packaging line, an auditor checks five batch records and finds that all five lack required line-clearance verification signatures. Four other departments remain on the schedule before the closing meeting. What should the auditor do next?
- During an internal audit of a medical-device warehouse, an auditor finds five shipping cartons missing required lot-number labels. The warehouse manager immediately prints and applies the missing labels and asks to close the nonconformity. Why must the auditor require further action?
- Two weeks before a scheduled three-day on-site quality system audit of a contract medical-packaging supplier, the lead auditor's pre-audit review of the supplier's quality manual and core procedures reveals that several required process controls are completely absent from the documentation. What should the lead auditor do next?
- Two weeks before a scheduled on-site quality audit of a chemical-manufacturing plant, the lead auditor has finalized the time-blocked audit plan. Which pre-audit coordination step should the lead auditor complete next with the auditee's host?
- During an on-site process audit of an electronics assembly cell, an auditor observes an operator using an undocumented fixture setup that reduces cycle time by 20% and produces zero defects, rather than following the controlled work instruction. How should the auditor handle this observation?
- After an internal audit finds that a final-inspection vision sensor was misconfigured for three weeks, the production manager submits a corrective action plan that fixes the sensor recipe and retrains technicians, but does not address units already in the warehouse. Why should the auditor reject closure of this response?
- After an internal audit cites a contract sterilizer for inconsistent cycle-parameter reviews, the quality manager submits a corrective action plan proposing an automated software interlock to eliminate manual entry errors. However, the plan omits an owner, completion date, and verification method. How should the auditor respond?
- After a medical-device assembly audit uncovered an unaddressed electrostatic-discharge hazard at a rework bench, the engineering team installed grounded wrist straps and updated the bench work instruction. Before closing the corrective action, what should the auditor also check if required by the quality system?
- During a two-day quality system audit of a medical-device assembly plant, an auditor finds three separate instances of unapproved handwritten changes on work instructions in receiving, kitting, and final packaging. How should the lead auditor report these observations?
- Two days after an internal audit cites a hospital pharmacy for missed refrigerator-temperature sign-offs, the pharmacy manager installs an automated digital alert and asks the lead auditor to close the finding as verified effective the next morning. How should the lead auditor respond?
- During a process audit of an aerospace fastener line, an operator is using a temporary alternate heat-treat cycle that differs from the standard work instruction. When asked, the supervisor presents an internal temporary deviation form. What should the auditor verify next?
- Sixty days after an internal audit cited a contract electronics assembler for outdated soldering profiles, the quality manager submits a revised work instruction with a new approval date and asks to close the corrective action. Before closing the finding, what must the auditor verify?
- While preparing for an upcoming internal quality audit of a medical-device assembly plant, the lead auditor receives the facility's quality manual, organization chart, six months of customer complaint logs, and recent process scrap trends. How should the lead auditor use the complaint and scrap data during audit planning?
- After a three-day quality system audit of a specialty chemical plant, the audit team found two minor nonconformities in calibration logs, while observing exceptionally disciplined batch-record controls and zero errors across twelve production lines. How should the lead auditor reflect these results in the final audit report?
- During a two-day quality system audit covering the past twelve months of calibration records at a metrology lab, an auditor pulls the top twenty folders from the current month's inbox because they are easiest to reach. Why should the lead auditor require a revised sampling approach?
- Two days after issuing the final report for a complex multi-site quality audit, the lead auditor gathers the audit team for a brief internal debrief. What is the primary purpose of this post-audit team review?
- During a process audit of an injection-molding facility, an operator presents digital caliper printouts showing that every molded housing meets critical wall-thickness tolerances. Before accepting these measurements as objective audit evidence of product conformity, what must the auditor verify?
- During a scheduled receiving-dock audit at an aerospace electronics assembler, an auditor inspects incoming capacitor reels and notices mismatched manufacturer logos, altered lot codes, and missing traceability certificates on a batch already cleared into stock. What should the auditor do?
- Two weeks before a scheduled internal audit of a diagnostics manufacturing plant, the lead auditor's pre-audit document review reveals that the plant recently automated its vial-labeling station and outsourced final carton sterilization. How should the lead auditor adjust audit preparation?
- After completing a second-party quality audit of a contract medical-device molder, the lead auditor finalizes the report containing proprietary process yields and three major nonconformities. A sales representative from the customer's company asks for a copy of the full report to use in upcoming price negotiations. What should the lead auditor do?
- Two weeks before a scheduled quality system audit of a pharmaceutical packaging plant, the auditee's quality manager emails the lead auditor requesting the exact list of 25 batch numbers to be inspected so staff can pull the binders ahead of time. How should the lead auditor respond?
- On the morning of day two of a three-day multi-auditor quality system audit, one of the three auditors falls ill and cannot participate. How should the lead auditor respond?
- Sixty days after an internal audit cited a food-packaging plant for recurring label-mixup errors, the auditor returns for follow-up. Instead of the manual double-check originally proposed in the corrective action plan, the plant installed an inline barcode verifier and updated its CAPA record. How should the auditor evaluate this change?
- During a break on day one of a scheduled process audit at a food-packaging plant, a line operator privately tells the auditor that night-shift workers routinely bypass metal-detector checks. The topic falls within the audit scope. What should the auditor do next?
- While auditing incoming receiving at an aerospace electronics plant, an auditor notices several moisture-sensitive component reels stored outside dry-cabinet humidity controls, even though humidity storage is not on the receiving checklist. How should the auditor proceed?
- During a process audit of a pharmaceutical packaging line, an auditor pulls a batch record completed six months ago and notices a tolerance limit that differs from the current work instruction posted at the station today. What should the auditor verify first?
- A newly qualified auditor begins a one-day process audit of a circuit-board soldering line by asking for six months of binder logs in a conference room before ever visiting the shop floor. Why should the lead auditor recommend walking the line first?
- Two days after the closing meeting of an internal quality audit at a hospital laboratory, the lead auditor sends a draft report to the lab director for factual review. The director agrees with the evidence but asks to soften the overall audit conclusion so it sounds more favorable to executives. How should the lead auditor respond?