A lead auditor is preparing for a scheduled three-day quality audit of a contract electronics assembler, but learns that the plant's quality manager, calibration records, and primary test area will be unavailable due to a facility relocation during that week. What should the lead auditor do first?
Select an answer to reveal the explanation.
Short Explanation
Think of audit feasibility like checking the weather before a flight—you wouldn’t take off if the runway were closed. Before fieldwork, confirm that essential people, locations, and records are accessible so you don’t force an incomplete visit.
Full Explanation
An audit can produce valid, objective conclusions only when necessary personnel, physical areas, and records are accessible during fieldwork. That is why you should assess audit feasibility with the audit client and adjust dates or scope. When a facility relocation makes key staff, calibration records, and the primary test area unavailable, confirming feasibility early lets the client and auditee revise the plan before resources are wasted. Proceeding with the scheduled dates and limiting fieldwork to the shipping dock and warehouse would distort the planned scope without client approval and leave core manufacturing controls unverified. Issuing a major nonconformity immediately for failing to make personnel available is premature: no fieldwork or objective evidence gathering has occurred yet. Delegating the entire on-site verification to the supplier’s internal staff would compromise independence and violate the requirement for impartial evaluation. As an exam caveat, repeated access delays without a legitimate operational reason may warrant escalation to the audit program manager as a potential program risk. As a practical check, confirm dates, process availability, and required record access in writing with the auditee coordinator at least two weeks before arrival.
Prefer to study offline? Printable PDF study book + test engine ($7.50, unofficial). These questions stay free here.