Authentication and Access Control (20%)
810-115 · 60 questions
- At a sugar refinery, operators must start and stop a cooker from the HMI, but only automation engineers may download controller logic. Which access property is that?
- A contractor plugged a laptop into Cisco IE port Gi1/3 beside a crane PLC, and the PLC lost link. The port is err-disabled and show port-security reports a violation. Which behavior caused the outage?
- A pipeline vendor wants a standing VPN from their office laptops straight into the compressor PLC VLAN so they can connect at any hour. Which design should the asset owner use instead?
- A rail crew shares one password for a wayside HMI, and the password is written inside the cabinet. After an incident, nobody can say who sent a command. Which practice closes that gap?
- An engineer already on the plant VPN wants to download logic to one cannery filler PLC. The site standard is zero-trust access. Which process should the system follow?
- A cold-storage supervisor needs to see one HMI from home during an alarm. The supervisor must not download logic or reach other panels. Which remote-access design fits?
- A gas-plant technician who could log into the compressor HMIs and the engineering station left the company this morning. Which access change fits once that departure is known?
- A vendor on a support call needs to watch one grain-terminal HMI for two hours and must not program controllers or keep access afterward. Which authorization matches zero trust here?
- A glass-furnace PLC accepts a logic download from any host that can reach its programming port and has no user accounts of its own. Which control matches that limitation?
- After a Cisco IE switch was replaced, a clean-in-place PLC shows link up, but the HMI on VLAN 20 cannot reach it. show vlan brief lists the PLC port in VLAN 1. Which fault is that?
- An irrigation HMI can ping its PLC, and both ports are up in the correct VLAN. Modbus TCP to port 502 fails. The ACL on the path permits ICMP and denies TCP 502. Which fault explains it?
- A stamping-plant vendor asks for the press PLC programming port to be published on the public internet so home support can connect directly. Which response matches the remote-access standard?
- A turbine vendor's logged remote session at a power plant ended with the approved window. At midnight the vendor account and the temporary firewall path are still open. Which action fits?
- After overnight panel work at a cheese plant, a mixer PLC has no link. On the Cisco IE switch that interface is administratively down. Which cause fits the symptom?
- After a trunk edit at a printing plant, press HMIs on switch A cannot reach PLCs on switch B, while devices on the same switch still communicate in the cell VLAN. Which cause fits?
- An engineer at a food plant was approved to download logic to one mixer PLC during a window, then asks to download logic to every other PLC under that same approval. Which decision fits a zero-trust rule?
- A desalination plant commissioned a new intake PLC and left the vendor default password active. That password is printed in the public manual. Which practice closes the exposure?
- A change ticket at a glass plant approves a logic download to one lehr PLC. The engineer asks to reuse that approval on every PLC in the forming area. Under a zero-trust standard, what should access control do?
- An automation engineer left a refinery on Friday. On Monday that engineer's personal HMI login and jump-host login still authenticate. Which account action fits?
- A controls engineer left a container terminal on Friday, and on Monday that person's account still opens the engineering station and the crane PLC project. Which action closes the gap?
- A vendor laptop holds a VPN into a port crane network and at the same time split-tunnels general browsing to the public internet. Which concern does that raise?
- A vendor session to a port-crane HMI was approved for one hour on the jump host. The hour ended, the session is still open, and nothing recorded it. Which control should that jump host enforce?
- After a core-switch change at a water plant, a clarifier PLC and its HMI are up in VLAN 40 on access ports of two different switches, but they cannot communicate. The trunk between the switches does not list VLAN 40. Which fault explains the outage?
- A flood-gate jump host cannot reach its identity service during a storm. One named engineer must view one gate HMI. Which path still fits zero trust?
- An HMI cannot open Modbus to its PLC. The access list shows a deny of all IP above the permit for that HMI, and the deny counter is climbing. Which change fits?
- The engineering station at a water plant boots straight into a shared Administrator desktop, and anyone at the keyboard can open the PLC software. Which change fits industrial access practice?
- An engineer at a building-automation campus was approved to download logic to one air-handler controller, then asks the broker to open programming on every controller because that approval exists. Which decision fits?
- A contractor in a building-automation control room plugs a laptop into the cabinet switch and starts a controller download. Nobody has approved that person, that laptop, or that controller. Which decision fits?
- A gas-well integrator asks for a permanent internet port-forward to the pad PLC so support can connect from home at any hour. Which design should the asset owner use instead?
- A packaging tech plugged a small switch into an HMI port on a Cisco IE switch. The port is err-disabled and the log names BPDU guard. Which recovery fits?
- A mining-site engineer has left the company, and that person's named account can still download logic to the hoist PLC. Which action closes the gap?
- A vendor says they are ready and asks the on-shift technician to open the remote path into a chemical cell alone. The plant rule is two-person approval. Which action fits?
- A vendor was approved to download logic to one freezer PLC at a food plant. The vendor now wants that same approval to cover every PLC on the line. Which decision fits?
- A vendor wants a VPN into a packaging cell while their laptop keeps a direct path to the internet. Which decision fits?
- After a trunk cleanup, a control-room HMI cannot reach a robot cell, but PLCs and drives on the cell switch still communicate. The uplink trunk no longer allows the HMI VLAN. Which explanation fits?
- A substation vendor account on the engineering workstation is still active months after the outage that justified it. Which practice closes that gap?
- A port-crane vendor turns on split tunneling so a laptop stays on the public internet while its remote session reaches the crane PLC. Which concern should shape the design?
- An engineer was approved to download logic to one dairy pasteurizer PLC today and now asks to program every other PLC on that same approval. Which decision fits zero trust?
- An approved engineer at a port wants to download logic to a crane PLC from a personal laptop that the plant does not manage. The site’s device-access policy requires a managed engineering workstation for PLC programming. Which decision fits zero trust?
- After a switch change, hosts inside VLAN 20 still reach each other and hosts inside VLAN 30 still reach each other, but nothing routes between them. The VLAN 30 interface is administratively down. Which fault fits?
- A new HMI can reach a PLC on its own IP subnet but cannot reach devices on other subnets. Its link, address, mask and access VLAN are correct. The design uses this VLAN’s SVI as the default gateway, but the HMI has another gateway address. Which fix comes first?
- A rail-signaling vendor account on the plant jump host is still enabled three months after the last outage. Which practice closes that gap?
- A rail signaling engineer left the agency last month, and that account can still log in to the wayside engineering station. Which action fits?
- Two Cisco IE switches carry a bottling cell. CDP reports a native VLAN mismatch, and the HMI's untagged frames show up in the wrong VLAN. Which change fixes the path?
- A pipeline vendor's jump-host password is phished. The attacker has no second factor, and the jump host is supposed to require one. Which control stops the reconnect?
- An engineer's approval to download logic to a mixer PLC ended at the close of the shift. At midnight the engineer wants to download again without a new approval. Which decision fits?
- An operator at a batch plant needs to acknowledge alarms on the HMI. A coworker wants that same login to force outputs and download logic. Which decision fits?
- A crane vendor asks a port authority to forward the PLC programming port from the public internet into a quay-crane cabinet for the weekend. Which design should replace that request?
- A port-crane integrator finished the contract last week, and that person's account on the engineering station still works. Which action closes the access gap?
- Operators say a filler HMI is up but painfully slow. The switch port is up in the correct VLAN, and CRC errors on that interface are climbing. Which cause fits?
- A robot vendor finished a visit last month. Their account on the jump host still works, and they want to use it again tonight with no new ticket. Which decision fits?
- A ticket approves a vendor to read tags on one palletizer PLC this afternoon. The vendor also wants to download logic to that PLC during the same call. Which decision fits?
- An engineer was approved to download logic to one chemical-feed PLC at a water plant, then asks to program every other PLC on site during the same VPN session. Which decision fits a zero-trust rule?
- At a container terminal, a quay-crane HMI and its PLC are in the same VLAN, both access ports are up, and a trunk sits between them. The trunk allowed list omits that VLAN. Which fault explains the outage?
- A vendor session on the plant jump host can copy PLC project files out to the vendor laptop. The plant wants the logic to stay inside the site. Which control fits?
- Engineers at a steel mill type the historian collector password into PLC programming software because it is the credential everyone remembers. Which correction fits?
- A night-shift account at a freezer plant is view-only on the HMI. The operator asks to use it to force a valve output. Which decision fits?
- An engineer approved to change one filler PLC at a beverage plant now wants to program every PLC on that line under the same approval. Which decision fits zero trust?
- A well-pad crew wants the PLC programming port forwarded from the public internet so a vendor can connect without calling the control room. Which design should replace that request?
- After a switch swap, a mixer PLC stays in VLAN 1. The work order shows the cell VLAN configured on the adjacent interface, and that adjacent port is empty. Which fix fits?