An engineer's approval to download logic to a mixer PLC ended at the close of the shift. At midnight the engineer wants to download again without a new approval. Which decision fits?
Select an answer to reveal the explanation.
Short Explanation
The permission had a clock, and the clock ran out at the end of the shift. You do not let midnight inherit the afternoon's yes. A laptop that stayed in the room is still a laptop, not a new approval.
Full Explanation
Explicit authorization includes the time it covers. This approval ended with the shift. A download at midnight is a new action and needs a new authorization, even for the same engineer and the same mixer PLC. The afternoon approval does not roll forward because the work felt unfinished. Staying in the control room is a location, and it does not extend a ticket. Applying the expired approval to every PLC on the line widens the scope at the same moment the time has lapsed. A device check can confirm the laptop is managed. It does not replace the authorization to change logic, so the same laptop does not revive an expired approval. Exam caveat: if operations opens a new window and names this PLC, the midnight download can proceed under that new approval. The failure is continuing on the old one. Operational check: a test download after the end time should be denied and logged against the engineer, and a freshly approved window for that same PLC should be the only path that succeeds. Do not stretch the old ticket past midnight.