After overnight panel work at a cheese plant, a mixer PLC has no link. On the Cisco IE switch that interface is administratively down. Which cause fits the symptom?
Select an answer to reveal the explanation.
Short Explanation
A breaker left off after the repair looks like a dead mixer even when the machine itself is fine. You are looking at a switch port that is still administratively shut. The link stays down until that port is enabled, and a VLAN theory does not explain a port that was turned off on purpose.
Full Explanation
An interface that is administratively down has been shut in the configuration. It does not bring the link up, regardless of the cable and the PLC. After overnight panel work, that status means the port is still shut and the mixer will not link until someone enables the interface. Err-disabled is a different state. A port-security violation in shutdown mode err-disables the port, and the switch reports err-disabled rather than administratively down. Reading this symptom as err-disable misnames the status the operator already has. A wrong VLAN can stop the PLC from reaching its HMI after the link is up. It does not mark the interface administratively down, and the link light is a physical and administrative matter before VLAN membership matters. An access list on a switched virtual interface filters routed traffic. It does not shut a switch port, and hit counts on an ACL would show drops while the interface stayed up. Exam caveat: enable the port only after the panel work is confirmed finished and the intended cable is seated. A port shut because the device was removed on purpose stays shut. Operational check: show the interface status, confirm the state is administratively down rather than err-disabled, then enable it and confirm the mixer MAC learns on that port.