3 Health Hazards and Basic Industrial Hygiene
STSC · 53 questions
- A utility crew lead on a street-widening project sees a laborer rolling plain cotton into balls and stuffing them into both ears before operating a pneumatic pavement breaker. What should the crew lead do?
- A plumbing foreman assigns two apprentices to manually carry 90-pound cast-iron pipe sections up two flights of temporary stairs all morning, and one apprentice reports lower-back strain before lunch. What is the foreman's best ergonomic control?
- A masonry foreman sees a worker dry-cutting concrete blocks with a handheld saw inside a partially enclosed parking garage, creating a thick dust cloud. What is the foreman's best first corrective step?
- During a winter warehouse retrofit, a crew plans to run a gasoline-powered walk-behind concrete saw inside an unventilated basement, and two workers already report mild headaches. What should the supervisor do?
- On a concrete bridge-deck rehabilitation, two laborers spend four consecutive hours breaking deteriorated concrete with pneumatic chipping hammers and report tingling and numbness in their fingertips. Which control should the supervisor implement?
- A roofing crew lead welcomes two newly hired laborers on a humid 92-degree afternoon for tear-off work, and both workers say they previously worked only in air-conditioned warehouses. How should the crew lead manage their workload on day one?
- During demolition of a 1970s school boiler room, a laborer begins tearing out crumbling white fibrous pipe insulation that is not listed on the pre-job hazardous-materials survey. What should the supervisor do immediately?
- During a hot August asphalt paving shift, a roller operator climbs off the machine looking flushed, stops sweating, and gives confused, slurred answers to simple questions. What should the supervisor do immediately?
- Inside an enclosed mechanical room, an ironworker is stick-welding galvanized steel pipe supports and begins coughing with a metallic taste, while wearing only a disposable nuisance dust mask. What should the supervisor do?
- Two floor-layer helpers are troweling a solvent-based contact adhesive with bare hands inside a windowless basement mechanical room and report dizziness and cracked skin. Which control addresses both routes of exposure?
- During a multi-floor office buildout, two carpenters repeatedly twist at the waist to lift 80-pound bundles of ceiling tile from the floor onto a rolling scaffold, and both report mid-shift back soreness. Which control should the foreman implement?
- On a large commercial foundation job, two ironworkers spend all morning bent over at the waist tying rebar cages directly on the mud slab, and both report lower-back stiffness by mid-shift. Which ergonomic control should the foreman implement?
- During a hospital ceiling rough-in, two electricians spend four hours continuously reaching overhead from ladders with arms raised and necks tilted back to drill concrete deck anchors, and both report shoulder soreness. Which ergonomic control should the supervisor implement?
- During a windy, wet 38-degree concrete form strip, a laborer begins shivering uncontrollably, slurring words, and fumbling hand tools. What should the foreman do immediately?
- On a hospital interior renovation, a portable diesel air compressor is parked inside a concrete corridor right next to four plumbers threading pipe, forcing workers to shout at arm's length. What is the supervisor's best first health control?
- During a commercial warehouse buildout, two floor-layer apprentices spend six hours kneeling directly on bare concrete slabs while installing vinyl base and report throbbing knee pain. Which control should the supervisor implement first?
- During a large commercial slab pour, a concrete foreman notices two laborers kneeling in wet Portland cement wearing cotton sweatpants and canvas sneakers without knee pads or waterproof gear. What should the foreman do?
- Before entering a concrete-cutting containment zone, a laborer puts on an assigned, fit-tested half-mask elastomeric respirator and immediately reaches for the saw without checking the facepiece seal. What must the foreman require first?
- While working on an exposed winter bridge deck, a carpenter pulls off a wet glove and shows the foreman two pale, waxy, numb fingers on one hand. What should the foreman do?
- During interior demolition of painted steel beams containing lead, a foreman sees two workers unwrapping sandwiches on a scaffold plank inside the containment area without washing up. What health control must the foreman enforce?
- While grading a parking lot on a humid 90-degree afternoon, a laborer begins sweating heavily, looks pale and clammy, and reports dizziness and nausea. What should the supervisor do immediately?
- During an interior hospital buildout, two drywall laborers report shoulder and lower-back strain from pulling loaded 600-pound panel carts backward down long corridors. Which ergonomic work practice should the supervisor require?
- During a bridge repainting project involving lead-based coatings, a supervisor sees workers planning to drive home in their dust-covered coveralls and work boots. What health control must the supervisor enforce?
- While stripping old adhesive from a concrete floor with a solvent-based remover, two laborers wear standard leather work gloves that quickly soak through to their hands. Which health control should the supervisor implement?
- While gutting an abandoned retail space during a commercial renovation, a laborer uncovers several discarded hypodermic needles behind a wall cavity. What should the site supervisor instruct the worker to do?
- While checking a leaking hydraulic fitting on a concrete pump, a mechanic wipes a pressurized pinhole spray with a gloved hand, feels a sharp sting, and sees only a tiny pinpoint mark with minimal bleeding. What should the supervisor do immediately?
- After concrete slab grinding inside a warehouse renovation, a supervisor sees two laborers using stiff push brooms to dry-sweep thick gray concrete dust across the floor, filling the air with haze. What must the supervisor require?
- A civil grading foreman notices that two scraper operators complain of lower-back pain after bouncing for hours across rutted haul roads in older machines with worn-out seat cushions. Which control should the foreman prioritize first to reduce whole-body vibration?
- During a food-processing plant expansion, two pipefitters are TIG-welding stainless steel process lines inside a tight mezzanine room with minimal natural airflow. Which control should the supervisor prioritize to reduce hexavalent chromium fume exposure?
- During a concrete demolition shift with high noise levels, a supervisor notices several laborers wearing disposable foam earplugs with more than half of each plug sticking out of their ear canals. What corrective instruction should the supervisor give?
- During a large commercial drywall buildout, two hangers report aching wrists and numbness in their thumbs after spending days driving thousands of screws with manual ratcheting drivers in awkward wrist angles. Which ergonomic control should the foreman implement?
- A utility crew is cutting into an active sanitary sewer main inside a shored trench where wastewater splashes onto workers' boots and forearms. Which health control must the foreman enforce to prevent infectious biological exposure?
- Before gutting an abandoned warehouse attic coated in thick layers of dried bird and rodent droppings, a demolition crew asks to sweep the floor with push brooms and wear basic dust masks. Which health control should the supervisor require?
- During an interior steel-stud buildout, an ironworker is arc-welding structural clips in an open corridor where framers walk past without tinted eye protection, and two passersby report gritty, painful eyes that evening. Which control should the supervisor implement?
- Near an open sanitary sewer tie-in, two utility workers briefly smell rotten eggs, then tell the foreman the air must have cleared because they can no longer smell anything. Why must the foreman stop work and require gas monitoring?
- On a masonry restoration project, a laborer is slitting open and pouring bags of dry hydrated lime into a mortar mixer while standing downwind in a swirling dust cloud without eye protection or gloves. Which health control should the foreman enforce?
- During final punch-list cleanup on a commercial renovation, a laborer plans to pour household bleach and an acidic masonry descaler into the same mop bucket to remove stubborn grout haze faster. What must the site supervisor order immediately?
- After standing for four hours in 45-degree muddy groundwater inside a utility trench, a pipefitter reports numb, tingling, blotchy red feet inside soaked leather boots. What should the site supervisor do?
- While preparing for abrasive blasting inside a steel tank, a crew lead plans to connect a supplied-air respirator hood to the jobsite's standard diesel air compressor used for jackhammers. Why must the supervisor stop this?
- During a concrete saw-cutting shift, a supervisor notices a worker wearing cap-mounted earmuffs whose vinyl cushions are cracked and stiff, with thick safety-glass temples holding the cups slightly off the worker's head. How does this affect hearing protection, and what should the supervisor require?
- During an occupied hospital wing renovation, a carpentry foreman opens a chase wall and discovers heavy black mold growth across damp drywall panels. Which control should the foreman require before demolition continues?
- A concrete demolition worker is operating a pneumatic jackhammer inside an enclosed subterranean concrete vault where reverberating noise exceeds the attenuation of single foam earplugs, and quieter electric breakers are unavailable. Which control should the supervisor implement?
- On a multi-story commercial buildout, masonry tenders must carry 90-pound bags of mortar mix 120 feet from the street curb to an interior elevator. Which ergonomic control should the supervisor implement?
- During a winter commercial buildout, a drywall crew sets up two unvented kerosene salamander heaters inside a poly-sealed second-floor wing to speed up joint-compound drying, and workers begin reporting throbbing headaches and nausea. What health control should the supervisor implement immediately?
- After three hours of shoveling gravel in 95-degree heat, a laborer complains of painful muscle spasms in both calves and abdomen while still sweating heavily and remaining alert. What should the supervisor do?
- During a weeklong summer heat wave on a commercial site-prep job, a grading crew is scheduled to hand-tamp trench backfill and set heavy precast catch-basin rings in direct sun. Which administrative control should the site supervisor implement to reduce heat stress?
- A bridge-deck crew is tying reinforcing steel in 25-degree weather with steady 20-mile-per-hour winds across an exposed river crossing. Which combination of controls best prevents cold stress during the shift?
- Two pipefitters spend six hours a day standing in one spot on a bare concrete slab threading and assembling valves at a stationary shop bench, and both report sore feet and lower-back stiffness. Which ergonomic control should the supervisor implement?
- During a concrete demolition shift, a foreman notices two laborers standing three feet apart have to shout at the top of their lungs to understand each other over a nearby chipping crew. What should the foreman do?
- A roofing foreman is supervising a crew installing metal flashing on a commercial parapet wall directly in front of active cellular panel antennas marked with radiofrequency warning signs. What must the foreman do before work begins in that zone?
- A painting crew is scheduled to prime interior drywall corridors on an occupied hospital renovation using a high-VOC solvent-based primer that produces strong vapors. Which industrial hygiene control should the supervisor pursue first?
- During a large commercial ceiling installation, two drywall hangers spend all morning lifting and holding 65-pound gypsum panels overhead from ladders and report burning shoulder and neck pain by lunch. Which ergonomic control should the supervisor implement?
- During a steel bridge renovation, an ironworker prepares to oxy-acetylene torch-cut structural beams coated with old lead-based paint inside a containment enclosure. What must the supervisor require before cutting starts?