4 Emergency Preparedness and Management
STSC · 50 questions
- A restoration crew is mixing and applying a corrosive acid brick cleaner on the fourth floor of a vacant mill building, and the nearest running sink is two floors down behind a locked mechanical door. What emergency equipment must the supervisor have in place before work starts?
- During an office renovation, a temporary power distribution panel sparks and ignites wire insulation inside the enclosure while the feeder breaker remains energized. Which fire extinguisher should the electrical foreman use?
- A mechanical foreman schedules oxy-acetylene torch cutting of steel hangers inside a renovation area where exposed wood joists cannot be relocated. What must the foreman assign before cutting begins?
- During a multi-story commercial renovation, the evacuation alarm sounds for a chemical odor, and a carpentry foreman reaches the outside muster area only to find one apprentice missing from the crew roster. What should the foreman do first?
- A utility crew attendant sees a coworker collapse inside a 12-foot sanitary manhole during valve work, calls out to the foreman, and starts climbing down the ladder to pull the coworker out. What should the foreman order immediately?
- During a multi-story interior buildout, a supervisor notices drywall stacks and rolling scaffolds parked inside a marked stairwell exit corridor, narrowing the walkway to 18 inches. What should the supervisor do?
- While refueling a portable concrete mixer, spilled gasoline ignites in a shallow puddle on the asphalt pad near a storage trailer. Which extinguishing method should the trained foreman use if the fire is small and incipient?
- During a commercial remodel, an electrician grabs a damaged temporary light string and freezes against a metal stud wall while still holding the energized cord. What must the foreman do first?
- A framer slips from a 6-foot stepladder onto a concrete slab, reports numbness in both legs, and asks coworkers to lift them into a pickup truck for a ride to an urgent care clinic. What should the foreman do?
- A roofing foreman on a steel-framed commercial warehouse hears distant thunder and sees dark storm clouds approaching while four workers are installing metal decking. What should the foreman do?
- While inspecting a mechanical contractor's staging yard, a site supervisor finds full oxygen cylinders stored right next to acetylene cylinders against a wooden shed wall with no barrier between them. What must the supervisor require?
- During an unannounced evacuation drill on a multi-story hospital build, the supervisor discovers that concrete grinders on the third floor completely drown out the temporary horn alarm, leaving three workers unaware of the drill. What should the supervisor do?
- On a bridge approach paving job, a paver's hydraulic hose bursts and spills several gallons of hydraulic fluid onto the asphalt ten feet uphill from an open municipal storm drain. What should the foreman have the crew do first?
- While trenching near a commercial driveway, an excavator bucket snags and ruptures a pressurized natural gas service line, releasing a loud hiss and strong mercaptan odor. What should the foreman order immediately?
- At the end of a woodworking shift in a hotel lobby renovation, painters leave linseed-oil-stained wiping rags piled inside an open cardboard trash box beside a stack of trim lumber. What must the foreman require for those rags?
- While walking a second-floor commercial buildout, a drywall foreman sees laborers stacking pallets of gypsum board directly in front of the corridor's only mounted fire extinguisher, blocking it from view. What must the foreman require?
- While framing a commercial retail shell, tornado sirens sound and a tornado warning is issued for the jobsite's county while crews are working inside the unenclosed steel frame and the mobile office trailer. Where should the site supervisor direct the crew?
- While unloading galvanized sheet-metal ductwork, a worker suffers a deep forearm laceration that is spurting bright red blood onto the slab. What should the trained supervisor do immediately?
- While grinding magnesium-alloy concrete screeds in a site fabrication tent, sparks ignite a pile of fine magnesium shavings on the steel workbench. Which extinguishing method should the trained supervisor use on this incipient fire?
- While soldering copper water lines in a renovation corridor, a pipefitter accidentally brushes a forearm against a hot torch tip, leaving a red, blistering two-inch thermal burn. What first-aid step should the supervisor take first?
- A civil crew is building a pump station 25 minutes from the nearest clinic or ambulance response, and no worker on the crew holds a current first-aid certification. What must the site supervisor arrange before work begins?
- During a monthly walk on a hospital renovation floor, a supervisor checks a mounted dry-chemical fire extinguisher and sees the pressure gauge needle sitting in the red recharge zone with no inspection tag. What should the supervisor do?
- During an afternoon concrete pour, a laborer suddenly collapses onto the slab, does not respond to shouting or shoulder taps, and is not breathing normally. What should the supervisor and trained responders do immediately?
- A 7-foot-deep utility trench wall suddenly collapses, trapping a pipefitter up to the waist while two coworkers grab shovels to jump down and dig them out. What must the utility foreman order immediately?
- During a cold-weather commercial buildout, a framing foreman sets up a portable fuel-fired space heater inside a poly-enclosed work zone, and the unit sits directly beside loose plastic sheeting and scrap lumber. What must the foreman require before igniting the heater?
- After an outdoor natural gas odor triggers an evacuation on a school renovation site, the warning horn stops sounding and several subcontractors begin walking back toward the building without direction. What must the site supervisor enforce?
- While pouring concrete footings, a laborer gets splashed in both eyes with wet Portland cement and cries out in burning pain. What should the site supervisor do immediately?
- While swinging a steel beam, a mobile crane boom accidentally contacts an energized overhead distribution line, and the crane is not on fire. What should the site supervisor instruct the operator and ground crew to do?
- During a busy concrete and steel delivery morning at a multi-building apartment project, subcontractors park flatbed trailers and stack rebar bundles across the site's designated fire-department access lane. What must the site supervisor require?
- While unloading a delivery truck, a forklift tine punctures a 55-gallon drum of an unfamiliar industrial solvent, releasing strong vapors that make nearby workers cough. What should the supervisor order immediately?
- While priming a basement mechanical room, a painter becomes dizzy and disoriented from concentrated epoxy vapors, and the supervisor moves the worker to fresh air and calls 911. Which document must the supervisor provide to arriving paramedics?
- An ironworker is preparing to arc-weld steel stair stringers on the third floor of an open commercial building directly above a second-floor storage area containing cardboard packaging. What fire prevention step must the supervisor require before welding begins?
- A concrete crew's portable gasoline-powered trowel machine runs low on fuel mid-pour, and a laborer brings a five-gallon safety can over to top off the tank while the engine is still idling so they do not lose time. What must the foreman order immediately?
- At noon on a four-story commercial framing site, the National Weather Service issues a high-wind warning for 3:00 p.m. while stacks of loose plywood and metal decking sit unstrapped on the fourth floor. What should the site supervisor order?
- During an elevated concrete deck pour on a commercial building, a section of shoring buckles and partially collapses, knocking down wet formwork while several workers scramble clear. What should the site supervisor order immediately?
- A carpenter on a residential framing site falls onto a protruding steel tie-rod, leaving a six-inch metal rod impaled deep in their thigh. What should the trained site supervisor do immediately while awaiting emergency responders?
- In a site storage yard, a mechanic prepares to gravity-transfer xylene solvent from a 55-gallon metal drum into a 5-gallon metal safety can using a metal spout. What fire prevention step must the supervisor require before the transfer begins?
- During a commercial warehouse interior buildout, a spark from a grinder ignites a small pile of cardboard packaging near a loading bay wall. A trained carpenter grabs a nearby ABC dry-chemical extinguisher to put out the incipient fire. What positioning rule must the carpenter follow while discharging the extinguisher?
- During a commercial flat-roof tear-off, overheated asphalt inside a mobile tar kettle ignites and flames shoot from the open lid while a laborer grabs a water hose. What must the roofing foreman order immediately?
- On a sprawling multi-building construction site with locked perimeter gates, an ambulance is delayed ten minutes at the north entrance after a worker suffers a severe fall because no one was assigned to unlock the gate and guide responders. What should the site supervisor add to the emergency response plan?
- During interior framing of a four-story apartment building, a supervisor finds that the only fire extinguisher on site is mounted inside the ground-floor job trailer. What must the supervisor require under 29 CFR 1926.150(c)?
- While clearing brush along a highway culvert project, a surveyor is stung by wasps, quickly develops hives and facial swelling, and begins wheezing while struggling to breathe. What should the trained site supervisor do immediately?
- While cutting structural steel angles with a hydraulic shear, a worker suffers a complete finger amputation. After calling 911 and controlling bleeding, how should the trained supervisor care for the severed finger?
- During an evacuation for a warehouse chemical fire, a framing foreman leads the crew to the primary outside muster sign, only to see thick smoke drifting directly toward that corner as the wind shifts. What should the foreman do next?
- A commercial contractor opens a new utility-corridor jobsite in a rural industrial park where 911 systems are not enhanced with automatic street-number display, and crews rely on mobile phones. What must the site supervisor post conspicuously at the site?
- On a multi-story wood-frame apartment build, a framing crew stacks pallets of lumber and piles of scrap sheathing directly around the site's only temporary fire hydrant and standpipe connection. What must the site supervisor require immediately?
- During an occupied hospital wing renovation, a site supervisor notices painters have wrapped plastic sheeting and masking tape tightly over active ceiling fire sprinkler heads and left them covered overnight. What must the supervisor require?
- While using a pneumatic stapler on a framing site, a carpenter is struck in the eye by a deflected staple that remains embedded in the eyeball. What should the trained site supervisor do immediately?
- While unloading drywall on a commercial renovation floor, a laborer suddenly collapses to the concrete slab and begins having a generalized seizure. What should the site supervisor do immediately?
- A general contractor installs an automated external defibrillator (AED) in the main jobsite trailer for a two-year hospital expansion. What must the site supervisor verify during routine emergency-equipment inspections?