(official category 18; see category page)
RPT · 12 questions
- During a routine six-month leak test of a sealed Cesium-137 radiography source, the wipe sample analysis measures 0.012 microcuries (444 Bq) of removable activity. What action must the licensee take immediately?
- Under NRC 10 CFR 34.49, what radiation survey must an industrial radiographer perform immediately after cranking a sealed gamma source back into its exposure device after each exposure?
- Under 10 CFR 20.1801 and 20.1802, what is required when a portable gauge containing a licensed sealed source is temporarily brought into an unrestricted area and is not in locked storage?
- A radiochemist transfers an aliquot of Phosphorus-32 solution into a clean glass beaker and leaves it unattended on a bench inside a posted Restricted Area. Under NRC 10 CFR 20.1904, what labeling is required on that beaker?
- A facility discovers that a sealed gamma source containing 1,500 times the quantity of licensed material listed in 10 CFR 20 Appendix C is missing from its storage vault, and an exposure to persons in unrestricted areas could result. Under NRC 10 CFR 20.2201, what reporting action is required?
- Under NRC 10 CFR 34.27, what is the maximum allowable interval between leak tests for an industrial radiography sealed source that remains in regular service?
- A technician stores a portable nuclear moisture-density gauge inside an unattended utility trailer overnight at a construction site. Under NRC 10 CFR 30.34(i), what physical security measure is required to prevent unauthorized removal of the gauge?
- A plant mechanic must enter a storage hopper equipped with a fixed Cs-137 level gauge to weld an internal baffle. Which source-control step must be completed and verified before the mechanic enters the hopper?
- An industrial radiographer wears a calibrated electronic alarming ratemeter on the belt during field gamma radiography. Why can this device not replace a handheld radiation survey meter when confirming source retraction after an exposure?
- A calibration laboratory stores several check sources containing licensed quantities of Cesium-137 in a lead-lined cabinet inside an unlocked hallway closet. Under NRC 10 CFR 20.1801, what deficiency must the radiation safety officer correct?
- A fixed nuclear level gauge uses a mechanical shutter with an external position indicator to block the Cesium-137 beam during maintenance. Why must a technician verify the closed status with a radiation survey meter rather than relying solely on the indicator?
- A technologist is performing a routine six-month leak test on a sealed Cesium-137 source housed inside a shielded industrial gauge. Where should the technologist collect the wipe sample to detect potential capsule leakage safely?