(official category 20; see category page)
RPT · 12 questions
- A maintenance crew working under a Radiation Work Permit (RWP) enters a pump cubicle and measures a general work-area dose rate of 180 mrem/hr, whereas the RWP pre-job briefing specified a maximum expected area rate of 30 mrem/hr. What action should the crew take first?
- Before a contractor crew enters a facility's restricted area for non-radiological electrical work, the radiation protection supervisor must determine who requires formal radiation protection instruction under NRC 10 CFR 19.12. Which annual occupational dose threshold triggers this instruction requirement?
- Under 10 CFR 20.1003 and 20.1902, what dose rate threshold at 30 centimeters from a radiation source or penetrating surface requires an area to be posted as a High Radiation Area?
- A facility has an entryway to a posted High Radiation Area where dose rates reach 350 mrem/hr at 30 centimeters, and the door cannot be kept locked because operators enter frequently. Under NRC 10 CFR 20.1601, which control measure satisfies access control requirements when no interlock reduces the radiation level?
- A facility operates an industrial irradiator room where dose rates exceed 500 rads in 1 hour at 1 meter from the unshielded source. Under NRC 10 CFR 20.1602, what must the licensee implement in addition to standard High Radiation Area access controls?
- A technician brings a small quantity of licensed radioactive material into a controlled room for a 3-hour calibration setup, rather than leaving it unattended overnight. Under NRC 10 CFR 20.1903(a), when is the licensee exempt from posting a caution sign in that room?
- A maintenance crew working under a Radiation Work Permit (RWP) for a routine visual inspection of a contaminated pipe discovers they must grind and weld a cracked bracket on that pipe, an activity not covered by the permit. What should the crew do before starting the grinding?
- A radiochemistry laboratory plans to store sealed and unsealed licensed radionuclides in a dedicated room where external dose rates remain below 0.5 mrem/hr. Under NRC 10 CFR 20.1902(e), what inventory threshold requires posting the room with 'Caution, Radioactive Material(s)' signs?
- Before entering a posted radiologically controlled area to replace a pump seal, each maintenance worker is required to read and sign the active Radiation Work Permit (RWP). What is the primary purpose of this sign-in requirement?
- A health physics technician is preparing caution signs to post a newly established Radiation Area in accordance with NRC 10 CFR 20.1901. Which standard three-bladed radiation symbol and color scheme must appear on the sign?
- A maintenance crew working under a Radiation Work Permit is preparing to unbolt a flange on a primary coolant pump that may release trapped contaminated water and airborne activity. Why does the work package include a mandatory health physics hold point immediately before breaking the flange?
- While performing maintenance inside a posted Radiation Area under a Radiation Work Permit, a worker's electronic personal dosimeter sounds an unexpected dose-rate alarm. What should the worker do?