A failed mixer PLC was replaced overnight. Port security still has the old PLC's MAC as the only secure address, and the new PLC cannot forward. Which fix fits?
Select an answer to reveal the explanation.
Short Explanation
The port is still guarding a machine that has left the building. You clear that secure MAC and allow the replacement. The trap is raising the maximum so the ghost address stays forever.
Full Explanation
A secure MAC is an allow entry. After a hardware swap the entry still names the old PLC, so the new one is a violation and does not forward. Removing the old address and installing the new one, as a static entry or a fresh sticky learn while the right device is attached, restores the port. Raising the maximum would keep a dead address and admit whatever else shows up. The uplink trunk is not the interface that learned the mixer. The native VLAN does not override a secure MAC on this access port. The caveat is to save the configuration if the new address was learned sticky, or the next reload forgets it. The check is show port-security interface: the secure MAC should be the replacement PLC, and that PLC should forward. Put the before-and-after evidence in the work order, including the interface or account you changed, the time, and the person who approved it. On the next shift, confirm the original symptom is gone and that the change did not open a second path while closing the first. If the process is still inside a live batch, leave the controller running and finish only the part of this work that does not restart it. That sequence keeps a correct fix from turning into an unplanned outage.