Events on the library-consortium team run because the calendar says so, even though no one can name the purpose. How should the Scrum Master / Team Coach respond?
Select an answer to reveal the explanation.
Short Explanation
A library meeting that exists because Outlook said so is a book club with no books. Each team event has a job: plan, inspect the increment, or improve. If nobody can name that job, redesign the session or stop holding an empty ceremony.
Full Explanation
Advanced Scrum Masters drive outcome-based team events, not calendar compliance. Planning, review, and retrospective exist to produce a plan, an inspected increment, or a system improvement. Empty ceremony, director steering, and handing the agenda to the RTE do not restore that purpose. The coach helps the library-consortium team name the outcome and change or drop events that no longer serve it.