A permitted hazardous waste storage facility stores drummed ignitable and corrosive wastes in an outdoor fenced yard adjacent to an industrial park road. Under federal RCRA security standards in 40 CFR 264.14, what combination of controls is required to prevent unknowing or unauthorized entry?
Select an answer to reveal the explanation.
Short Explanation
If you manage a permitted hazardous waste yard, security is your first line of defense against tampering and accidental exposure. The trap is thinking a fence or a light alone satisfies 40 CFR 264.14, when federal rules require both controlled access or surveillance and clear perimeter warning signs.
Full Explanation
Under 40 CFR 264.14, owners and operators of permitted hazardous waste facilities must prevent unknowing entry and minimize the possibility for unauthorized entry onto the active portion of the facility. To comply, the facility must Maintain a perimeter barrier with controlled entry or 24-hour surveillance and warning signs—specifically a 24-hour surveillance system or an artificial or natural barrier completely surrounding the active portion with controlled entry, paired with Danger—Unauthorized Personnel Keep Out signs posted at each entrance and visible from 25 feet. Choosing to Install motion-activated floodlights without any physical barrier or warning signs fails to physically restrict access or warn passersby. Opting to Post bilingual hazard signs only on individual drums rather than the perimeter leaves visitors unaware of hazards until they are already inside the storage area. Choosing to Rely on municipal police drive-by patrols without controlling gate access does not provide continuous surveillance or a secured entry point. As a caveat, a facility may qualify for a waiver only if it demonstrates to the Regional Administrator that physical contact with the waste or structures will not injure unknowing entrants and disturbance will not violate RCRA standards. As an operational check, inspect perimeter fencing, gate locks, and entrance signage legibility during routine facility inspections.
Prefer to study offline? Printable PDF study book + test engine ($7.50, unofficial). These questions stay free here.