Quiz 4 Question 12 of 20

Operators at a battery-manufacturing facility weigh lead-oxide powder inside a ventilated enclosure equipped with a local exhaust ventilation hood and a differential pressure gauge. Before starting a weighing batch, what should the operator verify to confirm the engineering control is functioning properly?

Select an answer to reveal the explanation.

Motivation