Quiz 7 Question 17 of 20

A data center FTD is getting a new outside uplink: four 10 Gbps links to a top-of-rack switch that the network team already configured for LACP. The uplink must deliver up to 40 Gbps of aggregate capacity across traffic flows on a routed Layer 3 interface, with the public address and outside zone on one logical interface and no VLAN tagging. Which port channel design meets the deployment requirements?

Select an answer to reveal the explanation.

Motivation