During a chemical plant emergency, two control-room operators must remain at their stations for three minutes after an evacuation alarm sounds to close reactor feed valves before exiting. Under OSHA's Emergency Action Plans standard (29 CFR 1910.38), what must the facility's written plan include for these operators?
Select an answer to reveal the explanation.
Short Explanation
Think of critical-shutdown staff like the captain securing the ship's valves before stepping into the lifeboat—you cannot leave their exit to guesswork. The common trap is assuming an evacuation plan only covers immediate exit, when your plan must spell out exact shutdown steps and safe egress triggers.
Full Explanation
Under OSHA's Emergency Action Plans standard (29 CFR 1910.38), a written plan must document Specific procedures for operating critical plant operations before those employees evacuate the building. Defining clear valve-closure steps, time limits, and abort conditions ensures trained operators can safely stabilize hazardous processes without becoming trapped by smoke or chemical vapors. Including A requirement that operators remain inside the control room until the municipal fire department arrives on site creates unnecessary life-safety risk, because OSHA requires prompt evacuation once critical shutdown tasks are complete or conditions deteriorate. Granting A waiver exempting critical-operations staff from participating in annual evacuation drills and headcounts violates accountability requirements, since every employee on site must be trained on evacuation routes and accounted for at assembly areas. Adding Instructions for the operators to perform offensive spill containment after closing the reactor feed valves improperly mixes Emergency Action Plan duties with HAZWOPER Hazardous Materials Technician responsibilities, which require specialized training and equipment. As a caveat, only personnel specifically trained and equipped for critical shutdowns may delay evacuation, and they must have an unobstructed escape route. Operationally, review shutdown checklists quarterly and verify backup remote shutoffs work during drills.
Prefer to study offline? Printable PDF study book + test engine ($7.50, unofficial). These questions stay free here.