A design team is permitting a 15-kW residential array on a mountain home at 7,500 ft with 60-psf ground snow, 120-mph wind exposure, and a known seismic zone on composite shingles. The AHJ wants stamped racking proof. Which location-load review should the designer require to approve the racking and attachment plan?