Quiz 1 Question 20 of 20

A crew is augering footings for a small ground-mount at a former fuel depot now used as a park. The environmental report flags this corner for possible petroleum-impacted soil, the contract requires notifying the site contact before a flagged area is disturbed, and a storm drain inlet sits ten feet downhill of the hole. The auger brings up dark, oily soil that smells of fuel. Which excavation control should the crew apply before more soil is removed from that hole?

Select an answer to reveal the explanation.

Motivation