Quiz 9 Question 16 of 20

A former electronics plant is being redeveloped into a commercial office building above a residual trichloroethylene groundwater plume. Indoor air sampling reveals chlorinated vapor intrusion above screening levels beneath the concrete foundation. Which engineering control should the remediation team install to protect building occupants?

Select an answer to reveal the explanation.

Motivation