Quiz 4 Question 5 of 20

A bulk petroleum facility operates an outdoor concrete diked containment area around three 15,000-gallon diesel fuel tanks. After heavy overnight rain, an operator wants to leave the containment dike's manual drain valve cracked open permanently so stormwater drains automatically to the storm sewer without backing up. What operating practice is required for diked secondary containment drains?

Select an answer to reveal the explanation.

Motivation