Quiz 1 Question 4 of 20

A maintenance shop generates spent aerosol-can puncturing residue and off-specification resin from a repair project and needs to arrange off-site disposition. Under RCRA generator standards (40 CFR 262.11), what is the generator's first required step before selecting a disposal or recycling facility?