Quiz 2 Question 5 of 20

A global logistics firm with 800 sites needs the control plane to survive a controller failure and to scale OMP load, considering three SD-WAN Controllers with affinity for regional edges. Connections must reconverge without full outage. Which control-plane scale and redundancy design using multiple controllers and controller groups meets the need?

Select an answer to reveal the explanation.

Motivation