Quiz 12 Question 15 of 20

A packaging-line repair requires two consecutive shifts of maintenance technicians, and the outgoing technician must leave at 3:00 p.m. while the equipment remains de-energized. Under OSHA's Control of Hazardous Energy standard (29 CFR 1910.147), how must the plant manage lockout during the shift change?