Quiz 11 Question 15 of 20

During a pre-lift check at a structural steel fabrication shop, a rigger notices several broken wires in one strand of a wire-rope sling and a kinked section near the eye splice. Under OSHA's Slings standard (29 CFR 1910.184), what action is required?

Select an answer to reveal the explanation.