Following an audit of a coated-film manufacturing line, a quality engineer wants to track the total number of surface blemishes counted on each standard 100-square-meter roll over time. Multiple blemishes can occur on a single roll. Which control chart is most appropriate?
Select an answer to reveal the explanation.
Short Explanation
When one roll can have zero, two, or ten blemishes, you’re counting defects per unit rather than sorting rolls into pass or fail. A c-chart tracks those counts over time when each inspection area is the same size.
Full Explanation
Counting multiple defects on a consistent inspection unit calls for a c-chart monitoring defect counts per constant-size inspection unit. Because every roll has the same 100-square-meter area and can contain multiple surface blemishes, a c-chart models Poisson-distributed defect counts per unit and helps flag special-cause spikes or shifts over time. A p-chart tracking the fraction of nonconforming rolls is not appropriate because it tracks binomial pass/fail proportions—whether each roll is defective—rather than how many blemishes appear on each roll. A Pareto chart ranking blemish types by total cost prioritizes categories but does not monitor process stability over time. An X-bar and R chart tracking continuous film thickness analyzes continuous measurements, not discrete attribute defect counts. One exam caveat is that a c-chart assumes a constant inspection area; if roll areas differ, raw counts are not directly comparable and the method must account for the differing area. As a practical check, confirm that inspectors apply the same blemish definition and lighting standard to every roll before establishing control limits.
Prefer to study offline? Printable PDF study book + test engine ($7.50, unofficial). These questions stay free here.