Night shift has not finished scoping a wastewater-plant notable. A supervisor wants it labeled True Positive so the queue looks clear at dawn. What should the analyst do?
Select an answer to reveal the explanation.
Short Explanation
An empty queue at dawn is not the same as a finished investigation. If scoping is not done, disposition stays Undetermined and status stays In Progress. Guessing True Positive to look productive is rubber-stamping.
Full Explanation
Undetermined is the correct disposition while analysis is incomplete. Status can be In Progress to show workflow without inventing a True Positive to empty the Analyst Queue. False Positive - Incorrect Analytic Logic requires evidence that the search is wrong, not merely that scoping is slow. Wastewater notables are not skipped because of assumed air-gap, and Closed without a supported disposition hides unfinished civic risk.