Ferry-depot delay models currently retrain every Monday because that is when the pipeline hook was built. A data-quality monitor has been red for ten days while the calendar job is still five days away. Ops must choose the trigger, not redesign the pipeline. Which trigger fits?
Select an answer to reveal the explanation.
Short Explanation
A data-quality monitor has been red for ten days, and the Monday calendar job is still five days away. Retrain now on that drift. Calendar is for labels on a clock, and a new-data event is for a fresh labeled prefix.
Full Explanation
Choose a drift-triggered retrain when monitors violate, a calendar retrain when labels arrive on a clock, or a new-data event when a labeled prefix lands. Do not wait out a red monitor for the next Monday, and do not rebuild the D3-227 hook. Personalize is not that trigger.