A boat-ramp permit model passed a pre-training Clarify check. After a new marina joined, a protected-group facet's live selection rate left the allowed band. This is a production-bias schedule, not a one-off training report. What should they run?
Select an answer to reveal the explanation.
Short Explanation
A protected-group facet's live selection rate left the allowed band. Run bias-drift monitoring on live predictions with Clarify plus Model Monitor. The Domain 1 pre-training report is not a live schedule, and Domain 2 interpretability is a coefficient explanation.
Full Explanation
Monitor bias drift on live predictions with SageMaker Clarify plus Model Monitor. That is not the Domain 1 pre-training bias report and not Domain 2 post-training interpretability. Polly is not that schedule.