Three acceptance lines sit on one dam-and-hiring program: any “open spillway” advice stays frozen 45 seconds so a licensed operator can cancel it; a hiring screen’s agreed fairness metric may not exceed a stated gap across named groups; the conventional over-pressure interlock must still trip even if the acoustic model is unsure. How should those three be mapped?
Select an answer to reveal the explanation.
Short Explanation
Map the three lines separately. A 45-second spillway freeze for a licensed cancel is intervenability. A stated fairness-gap limit across named groups is societal and ethical risk mitigation. The conventional over-pressure interlock that must still trip is safety. Do not collapse all three into a miss-rate band.
Full Explanation
Keep intervenability, ethical-risk mitigation, and safety distinct. Collapsing them into correctness, controllability, or Chapter 5 procedures loses those examples.