Quiz 13 Question 14 of 20

A concrete contractor brings a new walk-behind power trowel onto a slab pour, and the crew notices the throttle safety switch behaves differently from their older models. What document should the safety technician consult first to verify proper operating controls and required safety checks?

Select an answer to reveal the explanation.

Motivation