Quiz 5 Question 17 of 20

A maintenance welder is assigned to repair a crack on an empty 250-gallon steel tank that previously held toluene, a flammable liquid. Although the tank has been drained and looks dry inside, what must be completed before any welding torch is lit?

Select an answer to reveal the explanation.

Motivation